Solution list

Projection Picking System

  • Finished Goods Management
  • Inventory Management
  • Material Management
  • Picking
  • Traceability
  • Work-in-Progress Management
  • Cost Reduction
  • Implementation of Traceability
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Quality Improvement
  • Reduction of Human Errors

Projection Picking System The Projection Picking System is a state-of-the-art picking solution that utilizes image processing technology for flexible implementation. This system effectively supports picking operations in logistics cen…

AGV / AMR

  • Picking
  • Transportation Process
  • Cost Reduction
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence

AGV / AMR AGV (Automatic Guided Vehicle) and AMR (Autonomous Mobile Robot) are unmanned transport systems that automate material handling inside factories and warehouses. An AGV travels along magnetic tape or guide lines laid down in …

Date & Lot Shipping Management System (en)

Date & Lot Shipping Management System

This system manages date and lot codes during shipping — verifying every outbound package and supporting recall response with a complete shipping history. Benefits Date / lot verification Each shipment is verified against the order a…

DPM Print Inspection System (direct marking) (en)

DPM Print Inspection System (direct marking)

This system reads direct part marking (DPM) codes — laser etched, dot-peened or printed directly on the part — to verify content and quality before the part moves to the next process. Benefits Direct mark verification Reads and verif…

Assembly Process Traceability System (en)

Assembly Process Traceability System

This system collects every assembly result digitally — operator, part, lot and timestamp — building a per-unit production history that can be traced both forward and backward. Benefits Per-unit production history Each unit's pro…

Tool & Mold Management System (mix-up prevention + usage count) (en)

Tool & Mold Management System (mix-up prevention + usage count)

This system uses ID labels and a handheld terminal to manage tools and molds — preventing the wrong tool being used and tracking usage counts and maintenance cycles to avoid unplanned breakdowns. Benefits Tool / mold mix-up prevention…

Material Loading Mistake Prevention System (PLC-linked) (en)

Material Loading Mistake Prevention System (PLC-linked)

This system reads the part number of the material to be loaded with a handheld terminal, verifies it against the work order, and signals the PLC to physically interlock the machine when the part does not match — making wrong loading imp…

Storage & Picking Verification System (en)

Storage & Picking Verification System

This system uses a handheld terminal to verify part numbers and bin locations during put-away and picking, preventing wrong-part errors before they leave the warehouse. Benefits Wrong-part prevention Cross-checks scanned part number …

Kanban OCR Receiving Verification System (en)

Kanban OCR Receiving Verification System

This system reads kanban part numbers with OCR on a handheld terminal and verifies them against the purchase order, preventing receiving errors before parts enter the line. Benefits OCR-based part number recognition Reads characters …

WIP Location Management System (en)

WIP Location Management System

This system tracks work-in-progress storage locations with handheld terminals and bin labels — eliminating search time and lost inventory on the shop floor. Benefits No more searching Every WIP item has a known, validated location at…

Shipping Kanban Verification System (en)

Shipping Kanban Verification System

This system verifies outbound parts against the shipping kanban — preventing wrong shipments at the dock and recording every shipment automatically. Benefits Wrong-shipment prevention Each kanban is verified against the actual goods …

Blending Material Loading Verification System (PLC-linked) (en)

Blending Material Loading Verification System (PLC-linked)

This system verifies the material to be loaded into a blender against the recipe — and the PLC interlock keeps the mixer off until the correct material is presented. Benefits Reliable poka-yoke The mixer will not run when the loaded …

Filling Process Daily Report Paperless System (en)

Filling Process Daily Report Paperless System

This system replaces paper daily reports on the filling line with handheld terminal input on a large-screen PDA — recording quality, downtime and yield directly into the database. Benefits Paperless daily reports Operators record res…

GS1 Code Print Inspection System (en)

GS1 Code Print Inspection System

This system reads and verifies GS1 codes on packaging — ensuring that the printed content matches the master data and meets regulatory requirements. Benefits Print content verification Verifies the printed GS1 code against the master…

Packaging Material Verification System (en)

Packaging Material Verification System

This system verifies the packaging material loaded at the packing line against the production order — preventing wrong packaging and the rework it causes. Benefits Wrong-packaging prevention Loading the wrong material is blocked befo…

Equipment Rounds Inspection Paperless System (en)

Equipment Rounds Inspection Paperless System

This system digitizes the inspection rounds for production equipment and utilities — capturing readings and status with a handheld terminal and feeding maintenance and energy systems. Benefits Paperless rounds Operators record result…