
This system uses ID labels and a handheld terminal to manage tools and molds — preventing the wrong tool being used and tracking usage counts and maintenance cycles to avoid unplanned breakdowns.
Benefits
Tool / mold mix-up prevention
Verifies the tool against the work order before the operator continues.
Usage and maintenance tracking
Counts cycles automatically and flags when maintenance is due.
Avoid unplanned downtime
Detect end-of-life conditions before they cause line stoppages.
Centralized history
All tool events are logged in one place for traceability and audits.
Compatible Functions
- Barcode / 2D code reading — Identifies the tool / mold reliably on each use.
- No-code app builder — Configure usage rules and screens without coding.
- Device management — Push policy updates to handhelds remotely.