Solution list

RCS群制御・フリート管理

RCS Fleet Control & Management System

As AMRs (autonomous mobile robots) and forklift-type robots are adopted more widely across manufacturing sites and logistics hubs in Thailand, the challenge is shifting dramatically from "getting one robot to move" to "keeping a fleet …

CTUケースピッキングロボット

CTU Case-Picking Robot (Tote to Person)

In Thailand's manufacturing and logistics operations, where the shift to high-mix, low-volume production is advancing rapidly, warehouse picking still depends heavily on manual labor and walking time. The expansion of e-commerce, the i…

牽引型AGV

Tugger AGV (Cart Towing)

In manufacturing plants and logistics sites, the process of "moving things" generates no direct added value, yet it has continued to consume large amounts of labor and time. In the manufacturing industry across Thailand and the wider A…

フォークリフト型AGV/AMR(FMR)

Forklift AGV/AMR (Pallet Transport)

For companies that operate manufacturing and logistics sites in Thailand and across the wider ASEAN region, automating in-plant material handling is no longer simply "something to look into" — it is becoming a management theme that det…

潜り込み型AMR(ラテント)

Latent AMR (Rack Transport / Goods to Person)

In warehouses and factories, operators spend the whole day walking across vast floor areas, hunting for the right rack, and carrying goods in their arms. This is still an everyday sight at a great many manufacturing and logistics sites…

AGV / AMR

  • Picking
  • Transportation Process
  • Cost Reduction
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence

AGV / AMR AGV (Automatic Guided Vehicle) and AMR (Autonomous Mobile Robot) are unmanned transport systems that automate material handling inside factories and warehouses. An AGV travels along magnetic tape or guide lines laid down in …

Projection Picking System

  • Finished Goods Management
  • Inventory Management
  • Material Management
  • Picking
  • Traceability
  • Work-in-Progress Management
  • Cost Reduction
  • Implementation of Traceability
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Quality Improvement
  • Reduction of Human Errors

Projection Picking System The Projection Picking System is a state-of-the-art picking solution that utilizes image processing technology for flexible implementation. This system effectively supports picking operations in logistics cen…

RFID / Smart Card

  • Finished Goods Management
  • Inventory Management
  • Material Management
  • Picking
  • Traceability
  • Work-in-Progress Management
  • Cost Reduction
  • Implementation of Traceability
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Quality Improvement
  • Reduction of Human Errors

RFID / Smart Card RFID (Radio Frequency Identification) and smart cards are systems that utilize wireless communication technology to identify items and individuals, enabling the management and tracking of various information. They ar…

Digital Picking System

  • Finished Goods Management
  • Inventory Management
  • Material Management
  • Picking
  • Traceability
  • Work-in-Progress Management
  • Cost Reduction
  • Implementation of Traceability
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Quality Improvement
  • Reduction of Human Errors

Digital Picking System The Digital Picking System is a solution designed to enhance efficiency in parts picking processes and inventory management. This system utilizes light pick terminals to assist in the selection of components for…