Solution 18

AGV / AMR

AGV (Automatic Guided Vehicle) and AMR (Autonomous Mobile Robot) are unmanned transport systems that automate material handling inside factories and warehouses. An AGV travels along magnetic tape or guide lines laid down in advance, and is used mainly as an unmanned carrier that runs on fixed routes. An AMR, by contrast, is an autonomous mobile transport robot that recognises its surroundings, decides its own route, and moves while avoiding obstacles and people. Putting these to work makes transport operations more efficient and reduces the manpower they require — in particular, it enables automated transport from the picking area through to the assembly and packing processes.

AGV / AMR

Benefits

  1. Reduction of Operator Burden
    AGV and AMR automatically transport products after picking, significantly alleviating the physical burden of moving and carrying for operators. For example, by assigning a fixed operator to the packing station while the robot retrieves the necessary products, labor is saved, and the operator’s focus on tasks can be maintained.
  2. Minimization of Picking Errors
    AGV and AMR operate based on predefined routes and incoming/outgoing data, reducing the likelihood of picking errors due to human mistakes. This eliminates issues such as accidentally picking the wrong adjacent item, ensuring accurate product transportation.
  3. Cost Reduction in Transportation
    Automated transportation drastically cuts labor costs associated with transportation tasks. This leads to lower labor expenses and improved productivity. The overall cost performance of the company increases, as efficient operations are maintained while reducing the number of workers.
  4. Flexible Route Configuration and Environmental Adaptability (AMR)
    AMR feature automatic obstacle and person avoidance, allowing for flexible responses to changes in the environment. This enables easy adaptation during layout changes within factories and warehouses, permitting route modifications as needed. This flexibility enhances the system’s longevity and usability over time.
  5. Enhanced Productivity and Efficient Workflow Realization
    The introduction of AGV and AMR automates picking and transportation processes, resulting in a smoother overall workflow. This allows operators to focus on higher-value tasks, leading to increased overall productivity. Additionally, the reduction of unnecessary waiting and travel time further enhances operational efficiency.
Reference Article AGV vs AMR vs Manual Transport Performance Comparison: Why HIKROBOT AMR Is the Recommended Choice →