
This system reads the part number of the material to be loaded with a handheld terminal, verifies it against the work order, and signals the PLC to physically interlock the machine when the part does not match — making wrong loading impossible.
Benefits
Reliable poka-yoke
When the part does not match, the PLC interlock activates and the machine simply will not run.
OCR-based flexible matching
Reads part numbers directly from existing labels, with no need to add barcodes.
Less double-checking effort
Replaces visual double-checks with machine matching, freeing operators.
Automatic loading record
Order, part, quantity, timestamp and operator are recorded automatically.
On-site adjustments
Forms and workflows can be modified without programming when the line changes.
Compatible Functions
- OCR (text recognition) — Reads the part number directly from the existing label.
- PLC direct interlock unit — Interlocks the machine based on the verification result (released only on match).
- No-code app builder — Build or modify the app in minutes without programming.
- Device management — Manage and update handhelds remotely from a central console.