
This system digitizes the inspection rounds for production equipment and utilities — capturing readings and status with a handheld terminal and feeding maintenance and energy systems.
Benefits
Paperless rounds
Operators record results directly, no paper sheet.
Faster anomaly response
Out-of-range readings alert maintenance immediately.
Lower downtime
Early detection avoids unplanned breakdowns.
Audit-ready records
Every reading is timestamped and searchable.
Compatible Functions
- Barcode / 2D code reading — Identifies each equipment point reliably.
- No-code app builder — Design rounds forms without coding.
- Device management — Manage handhelds remotely.