Solution list

Stock & Expiry Management System (FIFO) (en)

Stock & Expiry Management System (FIFO)

This system manages stock together with use-by dates and enforces first-in-first-out picking — minimizing expired-stock waste in food, pharma and cosmetics operations. Benefits FIFO enforcement Older stock is picked first, automatica…

Storage Temperature Monitoring System (en)

Storage Temperature Monitoring System

This system monitors warehouse, refrigerator and freezer temperatures in real time — alerting operations when readings drift outside the allowed range to protect product quality. Benefits Real-time temperature visibility See every mo…

Quality & Compliance Management System (en)

Quality & Compliance Management System

This system centralizes quality records — inspections, certificates, deviations and corrective actions — to support audits, regulatory compliance and continuous quality improvement. Benefits Centralized quality records All quality da…

Traceability & Recall Response System (en)

Traceability & Recall Response System

This system tracks materials from receipt through production and shipping at the lot and serial level — enabling fast identification of affected units when a recall is needed. Benefits Rapid recall response Lot- and serial-level trac…

IoT & Automation Smart Factory System (en)

IoT & Automation Smart Factory System

This system integrates IoT devices and automation equipment to capture and act on shop-floor data in real time — driving visualization, automation and continuous improvement. Benefits Real-time shop-floor visibility See production, i…

Weighing & Dispensing Label System (mobile printer linked) (en)

Weighing & Dispensing Label System (mobile printer linked)

This system reads dispensed weights from the scale, prints a label on the spot via a mobile printer, and records the dispensing — eliminating manual transcription. Benefits Inline label printing Labels print right at the dispensing s…

Raw Material Receiving Verification System (en)

Raw Material Receiving Verification System

This system verifies incoming raw materials with a handheld terminal — reading labels, lots and use-by dates by OCR or barcode and matching against the purchase order at the dock. Benefits Wrong-material prevention Validates each del…

Shipping Verification & Mistake Prevention System (en)

Shipping Verification & Mistake Prevention System

This system verifies every outbound package against the order with a handheld scanner — eliminating wrong-quantity and wrong-part shipments in electronics distribution. Benefits Wrong-shipment prevention Validates each package before…

OCR-based Shipping Verification System (en)

OCR-based Shipping Verification System

This system uses OCR on a handheld terminal to read characters directly from shipping labels and verify them against the invoice / order — preventing shipping mistakes when no barcode is available. Benefits OCR-based verification Rea…

Barcode Mold Management System (usage count + maintenance) (en)

Barcode Mold Management System (usage count + maintenance)

This system labels every mold with a barcode and tracks usage counts, maintenance history and storage location — keeping molds productive and ready when needed. Benefits Mold history at a glance Usage counts, last maintenance and loc…

Barcode-based Traceability Foundation (en)

Barcode-based Traceability Foundation

This system establishes a barcode-based traceability foundation for the plant — covering material, process and finished goods — so production history can be searched at any granularity. Benefits Plant-wide traceability Material, proc…

Electronics Parts Receiving Verification System (en)

Electronics Parts Receiving Verification System

This system verifies incoming electronic parts against the purchase order at the dock using a handheld terminal — preventing wrong-part receiving before parts enter the warehouse. Benefits Wrong-receipt prevention Validates each deli…

Small-Parts Picking Verification System (en)

Small-Parts Picking Verification System

This system verifies every picked small part against the pick list with a handheld scanner — eliminating wrong-part picking in busy electronics warehouses. Benefits Mis-pick prevention Validates each pick against the order before it …

FIFO Expiry Management System (en)

FIFO Expiry Management System

This system manages part numbers together with use-by dates and storage conditions — enforcing first-in-first-out picking for electronic components and chemicals to prevent expired-stock usage. Benefits Expiry-aware picking FIFO is e…

Manufacturing Traceability System (machining process) (en)

Manufacturing Traceability System (machining process)

This system collects machining process results into a per-unit production history — enabling fast defect analysis and quality improvement on electronic component lines. Benefits Per-unit history Each unit's process, machine and …

Chip Reel Verification System (preventing reel mix-ups) (en)

Chip Reel Verification System (preventing reel mix-ups)

This system verifies chip reels at SMT loading with a handheld terminal — preventing the wrong reel from being mounted and causing line-stop defects. Benefits Reel mix-up elimination Each reel is verified against the program before b…