
This system verifies incoming raw materials with a handheld terminal — reading labels, lots and use-by dates by OCR or barcode and matching against the purchase order at the dock.
Benefits
Wrong-material prevention
Validates each delivery against the PO before put-away.
OCR-based flexibility
Reads labels even when no barcode is present.
Faster receiving
Replaces manual paper checks with on-the-spot scanning.
Quality assurance
Captures lot and use-by date together with the receipt.
Compatible Functions
- OCR (text recognition) — Reads label text including lot and date.
- Barcode / 2D code reading — Reads GS1 and 2D codes accurately.
- No-code app builder — Tailor receiving screens to your process.
- Device management — Manage handhelds remotely.