Solution 31

Small-Parts Picking Verification System

This system verifies every picked small part against the pick list with a handheld scanner — eliminating wrong-part picking in busy electronics warehouses.

Benefits

Mis-pick prevention

Validates each pick against the order before it is recorded.

Bin-level guidance

Directs operators to the correct bin and confirms the scan.

Faster picking

Real-time validation removes manual paper checks.

Operator independence

Guided workflow reduces skill-based variation.

Compatible Functions

  • Barcode / 2D code reading — Reads small-part labels reliably.
  • OCR (text recognition) — Reads label text when no barcode is present.
  • No-code app builder — Adjust pick lists and screens on site.
  • Device management — Manage handhelds remotely.