Solution 49

Traceability & Recall Response System

This system tracks materials from receipt through production and shipping at the lot and serial level — enabling fast identification of affected units when a recall is needed.

Benefits

Rapid recall response

Lot- and serial-level traceability allows fast target identification and recovery.

Unified traceability

Inbound, process and outbound history are managed in one place.

Recall progress visibility

Recovery status is visualized and managed centrally.

Quality assurance

Audit-ready records strengthen quality and trust.

Less manual handover

Replaces paper- and Excel-based handovers with reliable records.

Compatible Functions

  • Barcode / 2D code reading — Captures lot and serial codes at every step.
  • Cloud management — Centralizes traceability data across sites.
  • No-code app builder — Adjust process and field definitions without coding.
  • Device management — Centralized handheld management.