Solution 24

DPM Print Inspection System (direct marking)

This system reads direct part marking (DPM) codes — laser etched, dot-peened or printed directly on the part — to verify content and quality before the part moves to the next process.

Benefits

Direct mark verification

Reads and verifies DPM codes on the part itself, with no extra labeling step.

Quality assurance

Detects unreadable or incorrect codes before parts ship to the customer.

Production history

Each verified read feeds the traceability database automatically.

Inline workflow

Operators verify and continue without leaving the line.

Compatible Functions

  • DPM (direct marking) reading — Reads laser etched / dot-peened codes directly.
  • Barcode / 2D code reading — Handles standard barcodes and 2D codes.
  • No-code app builder — Configure inspection screens on site.
  • Device management — Remote management and firmware updates.