Download Partner List

  • IoT Traceability system domain

Electronic Document System i-Reporter Overview Document Thai ver.

The i-Reporter system digitizes paper forms and Excel reports, contributing to improved operational efficiency and cost reduction by streamlining data entry processes on-site. …

  • Production Management System Domain

PEGASUS Order Management System Overview Document Thai ver.

This system centralizes the management of data from order receipt to order placement, achieving improved efficiency and accuracy by integrating with inventory and production manag…

  • Production Management System Domain

PEGASUS Process Management System Detailed Document Thai ver.

This system manages order data, production planning, production progress, and quality information, supporting efficient process management and reducing lead times. …

  • Production Management System Domain

PEGASUS Warehouse Management System / WMS Overview Document Thai ver.

This system streamlines the inventory management process from receiving to shipping, achieving accurate inventory control through integration with barcode readers and Handy Termin…

  • Production Management System Domain

PEGASUS Label Printing System Detailed Document Thai ver.

This system supports label issuance using Handy Terminals, enabling efficient label printing tailored to on-site needs with both fixed and mobile printers. …

  • Production Management System Domain

PEGASUS Inbound and Outbound Inspection System Detailed Document Thai ver.

This system verifies data consistency using QR codes or barcodes during inbound and outbound processes, enhancing shipping accuracy and streamlining inspection operations. …

  • IoT Traceability system domain

Electronic Document System i-Reporter Detailed Document Thai ver.

The i-Reporter system digitizes paper forms and Excel reports, contributing to improved operational efficiency and cost reduction by streamlining data entry processes on-site. …

  • IoT Traceability system domain

PEGASUS Energy Management System Overview Document Thai ver.

This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Detailed Document Thai ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • Production Management System Domain

Systems for the Manufacturing and Logistics IndustriesPEGASUS Comprehensive Catalog Detailed Documentation Thai ver.

This is the comprehensive catalog of the PEGASUS series. It features solutions developed for customers in the manufacturing and logistics industries. Each package can be purchased…

  • Production Management System Domain

Systems for the Manufacturing and Logistics IndustriesPEGASUS Comprehensive Catalog Detailed Documentation

This is the comprehensive catalog of the PEGASUS series. It features solutions developed for customers in the manufacturing and logistics industries. Each package can be purchased…

  • IoT Traceability system domain

PEGASUS Energy Management System Detailed Document

This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.Thi…

  • IoT Traceability system domain

Electronic Document System i-Reporter Detailed Document

The i-Reporter system digitizes paper forms and Excel reports, contributing to improved operational efficiency and cost reduction by streamlining data entry processes on-site. …

  • Production Management System Domain

PEGASUS Inbound and Outbound Inspection System Overview Document

This system verifies data consistency using QR codes or barcodes during inbound and outbound processes, enhancing shipping accuracy and streamlining inspection operations. …

  • Production Management System Domain

PEGASUS Inbound and Outbound Inspection System Detailed Document

This system verifies data consistency using QR codes or barcodes during inbound and outbound processes, enhancing shipping accuracy and streamlining inspection operations. …

  • General

Company Profile Thai ver.

Our company is a system development firm that provides services to the manufacturing and logistics industries. We propose solutions for "cost reduction" and "business efficiency."…