Download Partner List

  • Production Management System Domain

PEGASUS Process Management System Detailed Document Japanese ver.

This system manages order data, production planning, production progress, and quality information, supporting efficient process management and reducing lead times. …

  • General

Curated Case Study Collection Thai ver.

This document compiles a selection of solutions we have provided to our clients, including use cases, innovative ideas, and the resulting benefits of implementation. …

  • General

Curated Case Study Collection Japanese ver.

This document compiles a selection of solutions we have provided to our clients, including use cases, innovative ideas, and the resulting benefits of implementation. …

  • Production Management System Domain

PEGASUS Production Management System Detailed Document Japanese ver.

This advanced management system addresses the diverse needs of the manufacturing industry, supporting small-lot production and short lead times, ultimately achieving improved oper…

  • Production Management System Domain

PEGASUS Order Management System Detailed Document Japanese ver.

This system centralizes the management of data from order receipt to order placement, achieving improved efficiency and accuracy by integrating with inventory and production manag…

  • Production Management System Domain

PEGASUS Lock Release System Detailed Document Japanese ver.

This system verifies the correct data during material input and only unlocks when the data matches, preventing incorrect inputs and enhancing the accuracy of operations. …

  • IoT Traceability system domain

PEGASUS Call Management System Detailed Document Thai ver.

This system enables flexible calling of specific departments, staff, or forklifts from the production floor or office, enhancing operational efficiency through rapid responses. …

  • Production Management System Domain

PEGASUS Process Management System Detailed Document Thai ver.

This system manages order data, production planning, production progress, and quality information, supporting efficient process management and reducing lead times. …

  • Logistics Improvement Solution Domain
  • Production Management System Domain

AGV / AMR Overview Document Thai ver.

An autonomous transport system that follows guide lines or navigates independently, enabling automated transport from picking areas and contributing to labor-saving in transport o…

  • IoT Traceability system domain

PEGASUS Traceability System Detailed Document Thai ver.

The system enables traceability by tracking and recording the processes from production to distribution and sales of products, contributing to quality management and enhancing rel…

  • IoT Traceability system domain

PEGASUS Smart Watch System Overview Document Thai ver.

The smart watch system allows real-time collaboration with staff located remotely, enabling swift responses and visualization of progress. …

  • IoT Traceability system domain

PEGASUS Call Management System Overview Document Thai ver.

This system enables flexible calling of specific departments, staff, or forklifts from the production floor or office, enhancing operational efficiency through rapid responses. …

  • IoT Traceability system domain

Electronic Document System i-Reporter Overview Document Thai ver.

The i-Reporter system digitizes paper forms and Excel reports, contributing to improved operational efficiency and cost reduction by streamlining data entry processes on-site. …

  • Production Management System Domain

PEGASUS Label Printing System Detailed Document Thai ver.

This system supports label issuance using Handy Terminals, enabling efficient label printing tailored to on-site needs with both fixed and mobile printers. …

  • Production Management System Domain

PEGASUS Warehouse Management System / WMS Overview Document Thai ver.

This system streamlines the inventory management process from receiving to shipping, achieving accurate inventory control through integration with barcode readers and Handy Termin…

  • Production Management System Domain

PEGASUS Process Management System Overview Document Thai ver.

This system manages order data, production planning, production progress, and quality information, supporting efficient process management and reducing lead times. …