Display Change
Weight Measurement Support System The Weight Measurement Support System is designed to wirelessly transmit measurement data from weighing devices to Handy Terminals, allowing for automatic recording and reflection of measurement resul…
Unlocking System The Unlocking System is designed to mitigate the risks of material picking errors and incorrect material input in the manufacturing industry. When materials are fed into the molding machine, the tank is locked, and th…
Label Printing System The Label Printing System is offered as an option for various Handy Terminal applications, supporting efficient label issuance in logistics and manufacturing environments. It can be utilized in a range of scenari…
Inbound and Outbound Inspection System The Inbound and Outbound Management System is designed to support accurate inspection during receiving and shipping operations. This system addresses the need to verify whether deliveries from su…
Electronic Document System: i-Reporter i-Reporter is a system that digitizes forms previously used on paper or in Excel, preserving their original layout. Data entered on-site is converted to digital format in real time, eliminating t…
Call Management System The call management system is designed to facilitate easy communication between the site and various departments, specific personnel, or forklifts. It allows for remote monitoring of on-site conditions and enabl…
Smart Watch System The Smart Watch System is a solution designed for rapid communication with staff located in different areas. By utilizing this system, various requests and notifications that arise on the worksite can be transmitted…
Visualization / IoT IoT (Internet of Things) in manufacturing involves connecting equipment and devices on the production floor to a network, enabling real-time data collection, management, and analysis. This technology aims to enhanc…