Solution 05

Call Management System

The call management system is designed to facilitate easy communication between the site and various departments, specific personnel, or forklifts. It allows for remote monitoring of on-site conditions and enables calls to be made as needed from the office. By notifying the destination of any equipment errors in advance, the system prepares for a prompt response before arrival, thereby saving time on-site. Featuring a touch display, it allows for simple modifications and adjustments to the call destination, ensuring flexibility in operations. Various devices, including tablets, smartphones, and smartwatches, can be utilized as calling terminals.

Benefits

  1. Rapid Response
    By notifying the designated location of equipment errors, the system ensures that preparations for a response are in place before arriving on-site, thereby reducing the time required to resolve issues.
  2. Reduction of Unnecessary Movement
    The calling system allows for the appropriate department or personnel to be summoned at the right time, decreasing unnecessary movement and improving overall work efficiency.
  3. Flexible Call Settings
    With the use of a touch display, users can easily adjust call destinations, enabling quick adaptations to varying situations and facilitating rapid changes to settings.
  4. Compatibility with Various Devices
    The system supports a range of calling terminals, including tablets, smartphones, and smartwatches, allowing users to select the most suitable device based on their needs and the specific work environment.
  5. Real-Time Situation Sharing
    The ability to make calls and check conditions from the office enhances communication between the site and the office, facilitating real-time information sharing.

Introduction Video