Solution list

Unlocking System

  • Inbound and Outbound Processes
  • Input Management
  • Material Management
  • Traceability
  • Work-in-Progress Management
  • Cost Reduction
  • Implementation of Traceability
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Quality Improvement
  • Reduction of Human Errors

Unlocking System The Unlocking System is designed to mitigate the risks of material picking errors and incorrect material input in the manufacturing industry. When materials are fed into the molding machine, the tank is locked, and th…

Label Printing System

  • Finished Goods Management
  • Inbound and Outbound Processes
  • Material Management
  • Traceability
  • Work-in-Progress Management
  • Cost Reduction
  • Implementation of Traceability
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Reduction of Human Errors

Label Printing System The Label Printing System is offered as an option for various Handy Terminal applications, supporting efficient label issuance in logistics and manufacturing environments. It can be utilized in a range of scenari…

Inbound and Outbound Inspection System

  • Finished Goods Management
  • Inbound and Outbound Processes
  • Material Management
  • Performance Data Collection
  • Picking
  • Traceability
  • Work-in-Progress Management
  • Cost Reduction
  • Implementation of Traceability
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Reduction of Human Errors

Inbound and Outbound Inspection System The Inbound and Outbound Management System is designed to support accurate inspection during receiving and shipping operations. This system addresses the need to verify whether deliveries from su…

Electronic Document System: i-Reporter

  • IoT
  • Performance Data Collection
  • Traceability
  • Cost Reduction
  • Improving Work Efficiency and Speed
  • Prevention of Personnel Dependence
  • Reduction of Human Errors

Electronic Document System: i-Reporter i-Reporter is a system that digitizes forms previously used on paper or in Excel, preserving their original layout. Data entered on-site is converted to digital format in real time, eliminating t…

Call Management System

  • Call Management System
  • IoT
  • Performance Data Collection
  • Traceability
  • Cost Reduction
  • Improving Work Efficiency and Speed
  • Optimization
  • Reducing Downtime

Call Management System The call management system is designed to facilitate easy communication between the site and various departments, specific personnel, or forklifts. It allows for remote monitoring of on-site conditions and enabl…

Smart Watch System

  • Call Management System
  • IoT
  • Performance Data Collection
  • Traceability
  • Cost Reduction
  • Improving Work Efficiency and Speed
  • Optimization
  • Reducing Downtime

Smart Watch System The Smart Watch System is a solution designed for rapid communication with staff located in different areas. By utilizing this system, various requests and notifications that arise on the worksite can be transmitted…

Traceability System

  • IoT
  • Performance Data Collection
  • Traceability
  • Cost Reduction
  • Implementation of Traceability
  • Quality Improvement

Traceability System The traceability system is a framework designed to thoroughly record and manage the production, distribution, and sales pathways of products, detailing where they are produced and how they reach customers. This sys…

Energy Management System

  • IoT
  • Performance Data Collection
  • Traceability
  • Cost Reduction
  • Implementation of Traceability
  • Quality Improvement

Energy Management System The Energy Management System is a tool designed to collect and analyze various energy consumption data in real-time within a factory. Utilizing a range of sensors throughout the facility, it digitizes detailed…

Visualization / IoT

  • IoT
  • Performance Data Collection
  • Production Planning
  • Cost Reduction
  • Improving Work Efficiency and Speed
  • Quality Improvement
  • Reducing Downtime

Visualization / IoT IoT (Internet of Things) in manufacturing involves connecting equipment and devices on the production floor to a network, enabling real-time data collection, management, and analysis. This technology aims to enhanc…