製造DXバナー
資料請求 - 英語 - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援 - Page 4

Document list

  • IoT Traceability system domain

Electronic Document System i-Reporter Overview Document Thai ver.

The i-Reporter system digitizes paper forms and Excel reports, contributing to improved operational efficiency and cost reduction by streamlining data entry processes on-site. …

  • IoT Traceability system domain

Electronic Document System i-Reporter Detailed Document Thai ver.

The i-Reporter system digitizes paper forms and Excel reports, contributing to improved operational efficiency and cost reduction by streamlining data entry processes on-site. …

  • Production Management System Domain

PEGASUS Inbound and Outbound Inspection System Overview Document Thai ver.

This system verifies data consistency using QR codes or barcodes during inbound and outbound processes, enhancing shipping accuracy and streamlining inspection operations. …

  • Production Management System Domain

PEGASUS Inbound and Outbound Inspection System Detailed Document Thai ver.

This system verifies data consistency using QR codes or barcodes during inbound and outbound processes, enhancing shipping accuracy and streamlining inspection operations. …

  • Production Management System Domain

PEGASUS Label Printing System Overview Document Thai ver.

This system supports label issuance using Handy Terminals, enabling efficient label printing tailored to on-site needs with both fixed and mobile printers. …

  • Production Management System Domain

PEGASUS Label Printing System Detailed Document Thai ver.

This system supports label issuance using Handy Terminals, enabling efficient label printing tailored to on-site needs with both fixed and mobile printers. …

  • Production Management System Domain

PEGASUS Lock Release System Overview Document Thai ver.

This system verifies the correct data during material input and only unlocks when the data matches, preventing incorrect inputs and enhancing the accuracy of operations. …

  • Production Management System Domain

PEGASUS Lock Release System Detailed Document Thai ver.

This system verifies the correct data during material input and only unlocks when the data matches, preventing incorrect inputs and enhancing the accuracy of operations. …

  • Production Management System Domain

PEGASUS Weight Measurement Support System Overview Document Thai ver.

This system wirelessly transmits weight data to Handy Terminals, improving the efficiency and accuracy of measurement operations while reducing data transcription tasks. …

  • Production Management System Domain

PEGASUS Weight Measurement Support System Detailed Document Thai ver.

This system wirelessly transmits weight data to Handy Terminals, improving the efficiency and accuracy of measurement operations while reducing data transcription tasks. …

  • Production Management System Domain

PEGASUS Warehouse Management System / WMS Overview Document Thai ver.

This system streamlines the inventory management process from receiving to shipping, achieving accurate inventory control through integration with barcode readers and Handy Termin…

  • Production Management System Domain

PEGASUS Warehouse Management System / WMS Detailed Document Thai ver.

This system streamlines the inventory management process from receiving to shipping, achieving accurate inventory control through integration with barcode readers and Handy Termin…

  • Production Management System Domain

PEGASUS Process Management System Overview Document Thai ver.

This system manages order data, production planning, production progress, and quality information, supporting efficient process management and reducing lead times. …

  • Production Management System Domain

PEGASUS Process Management System Detailed Document Thai ver.

This system manages order data, production planning, production progress, and quality information, supporting efficient process management and reducing lead times. …

  • Production Management System Domain

PEGASUS Order Management System Overview Document Thai ver.

This system centralizes the management of data from order receipt to order placement, achieving improved efficiency and accuracy by integrating with inventory and production manag…

  • Production Management System Domain

PEGASUS Order Management System Detailed Document Thai ver.

This system centralizes the management of data from order receipt to order placement, achieving improved efficiency and accuracy by integrating with inventory and production manag…