Document list

  • IoT Traceability system domain

PEGASUS Call Management System Overview Document Japanese ver.

This system enables flexible calling of specific departments, staff, or forklifts from the production floor or office, enhancing operational efficiency through rapid responses. …

  • IoT Traceability system domain

PEGASUS Smart Watch System Detailed Document Japanese ver.

The smart watch system allows real-time collaboration with staff located remotely, enabling swift responses and visualization of progress. …

  • IoT Traceability system domain

PEGASUS Smart Watch System Overview Document Japanese ver.

The smart watch system allows real-time collaboration with staff located remotely, enabling swift responses and visualization of progress. …

Traceability System Cover JP
  • IoT Traceability system domain

PEGASUS Traceability System Detailed Document Japanese ver.

The system enables traceability by tracking and recording the processes from production to distribution and sales of products, contributing to quality management and enhancing rel…

  • IoT Traceability system domain

PEGASUS Traceability System Overview Document Japanese ver.

The system enables traceability by tracking and recording the processes from production to distribution and sales of products, contributing to quality management and enhancing rel…

Energy Management System Cover JP
  • IoT Traceability system domain

PEGASUS Energy Management System Detailed Document Japanese ver.

This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.Thi…

  • IoT Traceability system domain

PEGASUS Energy Management System Overview Document Japanese ver.

This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Detailed Document Japanese ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Overview Document Japanese ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • Production Management System Domain

Systems for the Manufacturing and Logistics IndustriesPEGASUS Comprehensive Catalog Detailed Documentation Japanese ver.

This is the comprehensive catalog of the PEGASUS series. It features solutions developed for customers in the manufacturing and logistics industries. Each package can be purchased…

TOMAS TECH 会社案内 表紙 JP Feb 2026
  • General

Company Profile Japanese ver.

Our company is a system development firm that provides services to the manufacturing and logistics industries. We propose solutions for "cost reduction" and "business efficiency."…

PEGASUS Pokayoke System Cover TH

PEGASUS Shipping and Receiving Inspection System Detailed Data TH ver.

This system verifies data accuracy during receiving and shipping using QR codes and barcodes, improving shipping accuracy and streamlining inspection operations. …

PEGASUS Pokayoke System Cover EN

PEGASUS Shipping and Receiving Inspection System Detailed Data EN ver.

This system verifies data accuracy during receiving and shipping using QR codes and barcodes, improving shipping accuracy and streamlining inspection operations. …

PEGASUS Pokayoke System Cover JP

PEGASUS Shipping and Receiving Inspection System Detailed Data JP ver.

This system verifies data accuracy during receiving and shipping using QR codes and barcodes, improving shipping accuracy and streamlining inspection operations. …

PEGASUS Pokayoke System Cover VN

PEGASUS Label Printing System Details VN ver.

This system supports label issuance using Handy Terminals, enabling efficient label printing with stationary or mobile printers to meet on-site needs. …

PEGASUS Pokayoke System Cover TH

PEGASUS Label Printing System Details TH ver.

This system supports label issuance using Handy Terminals, enabling efficient label printing with stationary or mobile printers to meet on-site needs. …