Document list

  • IoT Traceability system domain

PEGASUS Energy Management System Overview Document

This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Detailed Document

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Overview Document

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • Production Management System Domain

Systems for the Manufacturing and Logistics IndustriesPEGASUS Comprehensive Catalog Detailed Documentation

This is the comprehensive catalog of the PEGASUS series. It features solutions developed for customers in the manufacturing and logistics industries. Each package can be purchased…

TOMAS TECH Company Profile Cover TH Feb 2026
  • General

Company Profile Thai ver.

Our company is a system development firm that provides services to the manufacturing and logistics industries. We propose solutions for "cost reduction" and "business efficiency."…

  • Production Management System Domain

Systems for the Manufacturing and Logistics IndustriesPEGASUS Comprehensive Catalog Detailed Documentation Thai ver.

This is the comprehensive catalog of the PEGASUS series. It features solutions developed for customers in the manufacturing and logistics industries. Each package can be purchased…

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Overview Document Thai ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Detailed Document Thai ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • IoT Traceability system domain

PEGASUS Energy Management System Overview Document Thai ver.

This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …

Energy Management System Cover TH
  • IoT Traceability system domain

PEGASUS Energy Management System Detailed Document Thai ver.

This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.Thi…

  • IoT Traceability system domain

PEGASUS Traceability System Overview Document Thai ver.

The system enables traceability by tracking and recording the processes from production to distribution and sales of products, contributing to quality management and enhancing rel…

Traceability System Cover TH
  • IoT Traceability system domain

PEGASUS Traceability System Detailed Document Thai ver.

The system enables traceability by tracking and recording the processes from production to distribution and sales of products, contributing to quality management and enhancing rel…

  • IoT Traceability system domain

PEGASUS Smart Watch System Overview Document Thai ver.

The smart watch system allows real-time collaboration with staff located remotely, enabling swift responses and visualization of progress. …

  • IoT Traceability system domain

PEGASUS Smart Watch System Detailed Document Thai ver.

The smart watch system allows real-time collaboration with staff located remotely, enabling swift responses and visualization of progress. …

  • IoT Traceability system domain

PEGASUS Call Management System Overview Document Thai ver.

This system enables flexible calling of specific departments, staff, or forklifts from the production floor or office, enhancing operational efficiency through rapid responses. …

  • IoT Traceability system domain

PEGASUS Call Management System Detailed Document Thai ver.

This system enables flexible calling of specific departments, staff, or forklifts from the production floor or office, enhancing operational efficiency through rapid responses. …