A pallet conveyor that interrupts a safety light curtain at every transfer will stop repeatedly. Muting can permit material to cross the protective field under defined conditions. Yet a successful safety light curtain muting design must do more than keep production moving: it must distinguish material from a person, prevent access to the hazard during the temporary suspension, preserve protection when signals are invalid, and demonstrate the result on the actual machine. This guide gives factory owners, engineers, maintenance teams and buyers in Thailand a common basis for requirements, sensor placement, sequence design, FAT, SAT and change control. It is not a wiring diagram or a universal parameter set. Use the current instructions for the selected devices and a machine-specific risk assessment.
1. Define exactly what muting suspends
A light curtain detects an interruption of a defined plane and passes a signal to the safety-related control system, which is intended to bring hazardous motion to a safe state. Muting temporarily suspends this protective function while material crosses the plane under specified conditions. It does not make an unobserved opening inherently safe. SICK’s Guide for Safe Machinery explains that other means must keep the state safe during muting, a person must not gain access to the hazard, an invalid signal combination or sequence must not enable muting, and muting must end as soon as the material has passed. OMRON explains that the timing of muting sensors A and B is used to distinguish a workpiece from a person and that placement should prevent a person from activating both as a permitted object would.
“Let pallets through; stop people” is a useful objective but is not a testable specification. Identify the hazardous robot, lift, press or conveyor pinch point; the state considered safe; all routes beside, above and below the load; tailgating behind a pallet; and the response when a load stops across the field. Tie these conditions to the machine layout and operating modes. For the broader device selection process, see the published safety relay selection guide and factory automation roadmap.
2. Separate muting, blanking and override
Muting is a condition-dependent, temporary suspension. Blanking permits interruption of specified beams under product-specific rules. Override is a special, controlled recovery operation for material left in the field after a fault. Treating all three as a generic “disable curtain” setting obscures their different risks. If operators must use override for every normal pallet, revisit the material flow. If people routinely need to enter through the opening for setup, do not describe that access as ordinary muting. Design a suitable operating or maintenance mode and access control.
Products differ in detection capability, protective height, built-in muting, supported controllers, time monitoring, fault indication and reset behavior. A photo of an old setting screen cannot establish equivalence on a replacement model. OMRON documents both built-in and external-controller examples. Record complete model numbers, compatible combinations, manual revisions and safety data before ordering.
3. Put the risk assessment on a plan and elevation
Draw the hazard, pallet outlines, conveyor width and height, fixed guards, service doors, pedestrian paths, forklift crossings and cleaning positions in plan and side views. Document normal direction, reverse travel, hand pushing and removal of a jam. Include the shortest and longest pallets, variable load heights, openings in a load, empty pallets, collapsed loads, transparent film and reflective wrapping. The object the sensors actually see matters more than the nominal product family.
Measure the total stopping behavior of the hazardous motion under stated conditions. ISO 13855:2024 covers positioning and dimensioning of safeguard detection zones with respect to human approach. It does not justify a guessed distance between sensor and hazard. A competent designer must consider detection capability, approach direction, measured stopping time and routes to the hazard. Because muting suspends the usual protective field for material flow, fixed guarding and the physical opening also need assessment.

Figure 1 is a concept for comparing relative positions. It does not specify mounting dimensions, electrical connections or a setting for a particular product.
4. Place muting sensors so material, not a person, meets the conditions
Candidate arrangements use multiple sensors with a defined order and timing along pallet travel. SICK describes L, T and crossed arrangements, each with implications for floor space, load contours, gaps, alignment and maintenance. A remembered distance between A and B cannot show what happens at the slowest speed, during a stop, or when a person leans into the opening. For every candidate, draw both the sequence that must be accepted and the sequences that must be refused.
Check whether a person can activate both sensors, whether the valid condition exists before the pallet interrupts the curtain, whether someone can stand beside or behind the load, and whether a smaller box can unexpectedly qualify. Inspect warped pallets and adjustment ranges, not only ideal CAD geometry. Verify that the entire permitted bracket adjustment range preserves the safety assumptions. Dust, washdown, vibration, conveyor sag, reflective packaging and neighboring equipment can alter detection in service. Record beam paths, mounting surfaces and actual load variants during the site survey. If a barcode or standard PLC signal is added for monitoring, state whether it is merely production data or a validated safety-related input.
5. Write a muting sequence as states and transitions
“A then B equals pass” is incomplete. Specify idle, first detection, permission, material in field, release, fault and recovery states. For each state, state what a curtain interruption does to hazardous motion. Muting should start and finish automatically under valid conditions; an invalid combination must retain protection. Do not make permission depend on a single electrical signal or entirely on ordinary software. A safety PLC or controller must be evaluated with its inputs, diagnostics, outputs, final switching elements and change management as part of the full safety function.
Distinguish sensors arriving too nearly together, too late, in the wrong order, or remaining active after passage. OMRON’s F3SG-SR/PG material lists reversed A/B order, simultaneous activation, a too-short interval, stalled material and insufficient spacing to the next workpiece as causes of sequence errors. Do not copy a model-specific time value into another device. Determine the allowed window from the selected manual, the minimum and maximum conveyor speeds, load length, and start/stop variation. Record a testable requirement and its rationale.
If the conveyor stops, do not leave muting indefinitely active. Define behavior after power loss, communication loss or a signal that remains high at restart. Decide explicitly how reverse travel and closely spaced pallets are handled. A production target to reduce stoppages cannot justify extending the permission until a person can enter. Change the material spacing or machine arrangement if safety and throughput constraints conflict.

Figure 2 compares an accepted passage with rejected sequences. Its arrows show event order, not terminal wiring or ladder logic.
6. Keep people out while the field is muted
The central question is whether a person can reach the hazard during the suspension. Inspect gaps beside the pallet, above the load, underneath the conveyor and behind a moving load. Test the smallest workpiece, partial loads and a shifted or collapsed pallet. A light curtain at the entry detects crossing of a plane; it does not automatically detect someone remaining inside the guarded space. Where a person can stay in the cell, evaluate additional presence sensing, guarded doors, reset location and visibility.
Observe actual work. Maintenance clears jams, quality staff take samples, night shifts move empty pallets and cleaners reach under conveyors. “People normally do not enter” is not a substitute for evaluating these tasks. If access is required, provide a suitable maintenance mode and energy isolation process. Keep reset distinct from start; ensure the reset point allows inspection of the hazard zone and that a pending upstream start request does not restart motion unexpectedly. The published safety relay guide explains the boundary from input to final stopping device, reset and external device monitoring.
7. Design the whole safety function, not a list of certified parts
The function runs from A/B sensors and curtain through wiring, evaluation logic, safety outputs, contactors or drives, physical stopping and restart prevention. ISO 13849-1:2023 specifies a design and integration methodology for safety-related parts of control systems. It does not specify the required PLr or safety function for a particular machine. A Type 4 curtain or a component labeled “up to PL e” does not establish the achieved performance of the whole installation. Set the requirement from the machine risk assessment, analyze the actual architecture and validate the installed behavior.
MES, barcode and ordinary PLC signals can be useful for diagnostics and production monitoring. They must not become the sole unvalidated basis for muting permission. If used as a safety-related input, evaluate the complete safety system, diagnostics and fault response. Do not normalize temporary bridging of a safety circuit as a production method.
8. Write the RFP before asking for a “light curtain kit”
Give bidders the machine number, hazard and layout, material directions, smallest and largest loads, speed range, measured stopping conditions, existing guards, modes and foreseeable faults. In a safety function table, identify what is detected, which hazardous motion is stopped, the required safe state and recovery conditions. Define how access is prevented during muting, when permission starts and ends, and what happens during reverse motion, jams and consecutive pallets. If stopping time or product dimensions are unknown, make site survey and design finalization explicit scope items.
Ask for complete model numbers and manual revisions, detection capability, sensor type and brackets, controller, safe outputs, muting indicator, diagnostic and recovery method. Compare the included safety-distance calculation, guard drawings, accepted workpiece range, PL/SIL assessment, stopping-time measurement, FAT/SAT, drawings, configuration backup, Thai support and spares. A low sensor price is not comparable with a quote that includes installation and validation. Align HMI words, cabinet labels and maintenance instructions for multilingual teams.
| Compare | Evidence to request | Weak answer |
|---|---|---|
| Scope | Workpieces, direction, speed, modes | “Works for pallets” |
| Placement | Plan/elevation and access analysis | “Adjust on site” |
| Safety function | Input-to-stop function table | Component certificate alone |
| Faults | Reverse, stall, stuck signal, power return | Normal-flow video only |
| Acceptance | FAT/SAT cases and pass criteria | “Commissioning included” |
9. FAT must test acceptance and rejection
Freeze the drawing, settings, program version and representative equipment. Confirm that every permitted pallet passes. Equally, demonstrate that invalid conditions retain protection: reverse A/B order, one sensor alone, simultaneous detection, load stopped midway, out-of-range speed, too-small gap to the next pallet, curtain interrupted before permission, and relevant sensor faults. Fault simulation belongs under a safe, approved test plan; do not energize a hazard merely to observe a failure.
Record test ID, requirement ID, drawing and setting revision, initial conditions, action, expected safety output and machine state, measured result, tester, correction and retest. A muting lamp turning on is not evidence that the machine stops when required. Separate cases where interruption is permitted during a valid transfer from cases where it must stop the machine. Time-aligned traces of A/B, curtain, muting status, stop request and final element are useful evidence. Every parameter change needs a reason and affected tests.

Figure 3 shows validation boundaries conceptually; its lines are functional relationships, not electrical instructions.
10. SAT verifies the installed opening and actual stop
After installation, check real conveyor height, adjacent machines, fence gaps, beam paths, floor levels, load offset, speed, lighting, dust and cleaning conditions. Measure stopping time for the actual hazardous motion and compare it with the approved placement basis. A simple “block the beam and see a stop” test does not prove access prevention during muting or restart behavior. Include small and large loads, empty pallets, stall, reverse motion, tailgating and power restoration in a safe site test plan.
Assign roles to owner, operator, maintenance team and integrator for test permission, hazard-zone watch, recovery, corrections and approval. Hand over final drawings, risk assessment, PL/SIL evidence, settings and versions, stop-time records, FAT/SAT results, inspection methods and post-replacement tests. Make Japanese, English and Thai operating terms consistent before release.
11. Control changes after handover
Load shape and speed are design assumptions. New pallet dimensions, stack patterns, wrapping, empty-container handling, conveyor speed or sensor brackets can invalidate the validated range. Extending a time window or moving a sensor to avoid nuisance stops is a safety-function change. Review the original risk assessment and test record, document the new assumption, and repeat affected tests before operation. Do not let “it worked yesterday” stand in for evidence.
Inspect beam alignment, dirt, indicators, damage, fixed guards and fault history according to the selected manual. When a fault occurs, stop and isolate, identify the cause, replace parts if needed, retest and obtain release approval. Holding a sensor, shorting an input or merely clearing an alarm conceals the fault. A spare with the same nominal model may still have different settings or firmware; compare backups and perform the required checks after replacement.
12. A practical rollout sequence for a Thai factory
Start with one transfer opening. Record current stops and reasons, including unofficial workarounds. Measure the stopping time and map load and people routes. Define accepted load variants and evaluate candidate layouts with operators and maintenance staff. Ask them to explain exactly where they stand and what they do during a jam. Agree on the safety function and test matrix before placing the order. FAT proves the configured behavior and relevant faults; SAT proves the installed geometry, site workflow and actual stopping. After handover, track muting errors, load changes, resets and guard movement alongside production downtime.
Ten questions for the design review
Can the team point to the hazardous motion and each human access route? What are the measured stop conditions? Which minimum and maximum loads and speeds are in scope? Can a person enter beside, above, below or behind material? Are each signal and controller safety-related or only operational? What happens if the curtain is interrupted before a valid material sequence? What happens after a stall, reverse travel, close-following pallet, fault or power return? Can anyone remain inside at reset? Who approves a product or setting change? Which FAT/SAT test ID proves each answer? Mark unresolved items with an owner, due date and required evidence. Never treat an estimated stop time as an approved measured value.
Keep acceptance records useful after startup
The test file is also a troubleshooting and change-control baseline. A later sequence error can be compared with A/B traces and workpiece conditions. A new product can be checked against the smallest and largest validated loads. A new stop-time measurement can be compared with the original load and brake condition. Store records in a format local maintenance staff can read, with matching terms for sensors, curtain, permission, stop request and recovery wait across HMI, drawings and work instructions.
13. Boundary conditions when extending to more lines
A successful arrangement on one line cannot simply be copied to the next. The distance to hazards, axes that stop, brake wear, pallet direction, guard height and service-door position may all differ. Reuse a bill of materials or test form if helpful, but reassess dimensions, loads, stopping time and access routes at every opening. Assign each opening its own risk assessment and test evidence even if the product codes are identical.
Where conveyors are shared, define what upstream and downstream equipment stops when the curtain detects a person or muting fails. A continuing upstream feed could leave a pallet across the opening and defeat the assumed release sequence. Stopping only the downstream equipment could create another pinch point. Include adjacent-equipment owners in the interface review. A material-present signal for production has a different meaning from a safety-related permission to mute. In the signal list, record source, receiver, normal and fault meanings, behavior on power loss, diagnostics and test ID. Sharing data does not automatically make a shared safety function.
14. Use nuisance-stop data to improve the design
If operators only reset each stoppage, the cause remains. Log time, product, pallet size, speed, A/B order, curtain state, diagnostic code and recovery action. Unstable detection with reflective packaging suggests an optical or sensor issue. Timeouts at low speed suggest the validated speed range and window need review. Faults only on night shift may point to cleaning, setup or empty-pallet handling. The purpose of measurement is to identify deviations, not automatically extend permission.
Select a remedy for the actual cause: improve a loose bracket, constrain a wandering pallet, update an accepted-load specification, correct version control, or address optical interference. If a remedy changes sensor position or logic, return to the safety-function and test tables. Verify that valid loads pass and the original invalid cases still fail. Track productivity and retained protection as separate acceptance measures.
FAQ
Are two muting sensors always enough?
No universal sensor count follows from a common example. Geometry, load shape, direction, access routes and selected device requirements determine the design. SICK documents several layouts and their limits. Validate that only material can meet the conditions and that people cannot enter while muted.
Can we copy the muting sequence times from another line?
No. Sensor positions, speed, load length and stop/start variation change the meaning of each interval. Use the chosen manual and test minimum and maximum conditions. A longer permission window can increase the time available for hazardous access.
Does muting stop a person tailgating a pallet?
Do not assume so. Assess how the load and guards close the opening, the spacing between pallets and whether a person can remain inside. Include tailgating in a safe simulated FAT/SAT scenario; never send a person into an active hazard to test it.
What differs between muting FAT and SAT?
FAT checks requirements against device combinations, logic, settings and accepted/rejected sequences. SAT checks actual loads, installed guarding, access, operating speed, stopping time, power return and restart. Use shared requirement IDs; FAT does not replace SAT.
Can we extend the muting time when the line stops too often?
First determine whether dirt, misalignment, a changed load, speed variation or a fault causes the stops. Changing the window changes a safety condition. Update the risk assessment, settings record and affected tests before restarting production.
Conclusion
Muting design is not complete when a pallet passes without stopping. It must connect hazards, opening geometry, stopping distance, guarding, workpiece variation, signal order, time limits, fault response and restart prevention in one validated safety function. Accept the installation when FAT and SAT show both valid material flow and retained protection under invalid conditions. Keep the design assumptions and evidence accessible for future maintenance and product changes.
If your Thailand plant has frequent conveyor stops at an existing curtain, is comparing retrofit quotes, or needs a FAT/SAT plan, share the opening drawing and load conditions with TOMAS TECH. We can discuss the scope from the site-survey stage.