Ball Screw Support Bearing Units: Selection and Installation Guide for Thai Factories

Ball Screw Support Bearing Units: Selection and Installation Guide for Thai Factories

Selecting a ball screw does not finish the design of a linear axis. The support bearing units determine where the shaft is located axially, how its ends are supported, and how loads enter the machine frame. A unit that looks similar on a product page may still fail to fit the machined shaft end or the mounting datum. This guide is for Thai factories procuring a new FA axis or replacing an existing one. For the screw and nut selection itself, see our ball screw selection guide; for alignment with the table, see our linear guide selection guide.

Start with an assembly drawing, not a part number

Draw the motor, coupling, fixed-side unit, screw shaft, nut, supported-side unit, linear guide, table, and frame in one view. Mark load direction, motor side, mounting datum, shaft-end machining, and inspection points. A quotation based only on the bearing housing’s nominal size leaves too much for each supplier to assume. THK describes its support units as dedicated bearing components used with ball screws. Its general arrangement uses a preloaded angular bearing on the fixed side and a deep-groove ball bearing on the supported side. That is a description of roles, not a promise that different manufacturers’ models interchange. Confirm every final dimension and installation instruction against the selected model’s current drawing and manual. See THK’s product overview.

1. Distinguish the fixed and supported ends

The fixed side establishes axial location and carries the relevant thrust load. The supported side guides the other end while allowing the specified axial arrangement to work as designed. Constraining both ends in an unintended way can make thermal expansion and assembly error harder to accommodate. Conversely, deleting the supported end because the axis appears short is not a safe rule: length, speed, orientation, and the maker’s selection method matter. Evaluate the complete axis.

THK lists square fixed-side EK and BK models and round FK and FKT models, together with supported-side families in its ball screw range. Compare center height, housing datum, bolt access, shaft-end shape, and interference with neighboring components, rather than comparing price alone. THK’s model page provides routes to dimensional drawings and recommended shaft ends. NSK’s WBK series also provides fixed and support-side assemblies intended to match standard NSK machined screws; its official product page does not establish interchangeability with another supplier’s shaft end.

Ball Screw Support Bearing Units: Selection and Installation Guide for Thai Factories - figure 1

Which physical end is fixed needs a decision on the assembly drawing. Review the drive layout, axial load, maintenance access, and the direction of the load in both travel directions. A vertical axis also needs a separate assessment of holding and fall prevention; the bearing unit alone is not the safety system. Label the drawing with coordinates and “Motor side” and “Opposite side,” because “left” and “right” reverse when technicians view the machine from opposite directions. Photograph the existing axis before disassembly, and record nameplates, previous modifications, and the coupling arrangement.

2. Match the machined shaft ends first

The nominal screw diameter is not necessarily the diameter at the bearing seat. The shaft shoulder, seat, thread, locknut, collar, and seal arrangement must match the unit’s sectional drawing. Even when the bearing bore appears correct, a shifted shoulder can prevent the inner ring from seating or move the coupling out of position. THK offers finished shaft-end products paired with dedicated support units, which illustrates why the pair must be selected together.

Send suppliers the screw model and drawing revision, drawings of both machined ends, the proposed units and their drawing revisions, and a list of included locknuts and collars. If the shaft and units come from different companies, obtain documented approval of the interface from both. On a retrofit, distinguish measured dimensions from the old original drawing; a previous repair may have changed the shaft end. Check the assembly in section, not just by overlaying external 3D shapes.

InterfaceEvidence before orderingTypical missed issue
Fixed-end seatApproved shoulder, thread, and bearing-seat drawingInner ring cannot seat correctly
Supported-end seatEnd drawing and support arrangementBoth ends assumed to be machined alike
Axis center heightDimension from machine datumScrew and guide heights differ
Mounting faceDatum, holes, and bolt accessExisting frame holes used without checking flatness
AccessoriesComplete bill of materialLocknut, collar, or seal missing at installation

3. Separate load, stiffness, and heat

“Strong enough” is not a selection criterion. Give the supplier the maximum thrust, normal duty cycle, shocks, speed, desired positioning performance, permitted deflection, and machine orientation. Static load capability and axial stiffness answer different questions. A unit may carry the load yet permit too much deflection for the process. Equally, a stiffer component may impose more demanding assembly and thermal conditions. Allocate the axis’s permitted displacement across screw, bearing support, frame, table, and linear guide.

Be precise about preload. Ball nut preload and fixed-side bearing preload are different things. A quote stating only “preloaded” must identify which component it means. Even where a maker supplies adjusted bearing preload, the locknut, fasteners, and mounting surfaces still need to be assembled according to model-specific instructions. Do not invent a universal tightening torque.

Heat from rotation and the surrounding machine can shift position between cold startup and stabilized operation. Whether and where axial expansion is accommodated depends on the support arrangement. A meaningful thermal estimate needs effective length, material, actual temperature distribution, and mounting details. For a temperature-sensitive process, agree where to measure and test both cold and warm operation at FAT or SAT.

THK announced orders for its FKT fixed-side unit on 30 April 2026. Its official announcement describes a three-row angular bearing structure intended for high-load performance and axial rigidity. FKT is a candidate for comparison on demanding axes, including vertical applications, but it is not automatically a drop-in upgrade or a guarantee of longer life in every machine. Compare the exact model’s load direction, envelope, shaft end, and manufacturer calculations.

Ball Screw Support Bearing Units: Selection and Installation Guide for Thai Factories - figure 2

4. Check the frame and guide alignment

A precise support unit cannot correct a tilted frame face. If the screw and guide are not parallel, the nut may encounter changing side load along the stroke. Verify the frame datum, flatness, perpendicularity, locating shoulder, and bolt joint against the machine drawing. Do not confuse a component tolerance with the tolerance of the assembled axis.

Agree on the assembly sequence before work starts: which guide is the reference, when the screw is aligned, and when each fastener is finally tightened. Forcing the shaft into position with bolts can make it seem acceptable by hand but create heat or vibration at operating speed. Check resistance through the complete stroke before and after final tightening. Use the selected manufacturer’s instructions for bolt sequence, torque, locking, and lubrication.

For Thai factory retrofits, survey the frame before ordering. Reusing holes may require machining a locating surface or correcting a distorted welded frame. Determine shutdown duration, machine access, isolation requirements, and first-piece inspection early. Otherwise a support unit can arrive on time while the frame work delays restart.

5. Compare approved drawings, not family names

THK, NSK, and HIWIN all provide related components, but family names and standard pairings differ. HIWIN’s ballscrews and supports overview and catalog library are the current official entry points for its support documents. A product family listing is not evidence of dimensional interchangeability with a different brand. Put model and drawing revision in every comparison row.

Decision pointEvidence required
Shaft-end compatibilityApproved sectional drawing and fit table
Fixed-side performanceModel-specific load and stiffness selection
Supported-side arrangementBearing layout and assembly manual
Center height and holesCAD, measured frame, approved mounting drawing
Installation and serviceTightening, lubrication, removal, and spares instructions
Commercial scopeItemized components, machining, installation, tests

Compare total installed cost: shaft-end machining, frame modification, alignment, downtime, and testing as well as component price. A cheaper unit that needs additional machining may cost more overall. If the existing axis already has vibration or high temperature, buying the same model again may leave the cause untouched. Record the observed fault and decide whether the goal is restoration or a design improvement.

6. Write a useful request for proposal

Specify the axis and purpose, orientation, stroke, speed and acceleration, carried mass, external forces, required accuracy, duty, temperature, and environment. Separate routine movement from infrequent setup movement. If an input is unknown, name the person who will measure or calculate it and mark the quotation conditional. Do not let each vendor insert a different unrecorded assumption.

Define who supplies the screw, fixed and supported units, locknut, collar, coupling, brackets, bolts, seals, lubricant, and spares. State whether shaft ends arrive machined, whether on-site work is allowed, and which drawings and certificates must be delivered. For a retrofit, include survey, removal, frame work, reassembly, commissioning, and production restart in the scope matrix.

Define acceptance before purchase. “Runs smoothly” cannot be audited. State where and how to measure stroke resistance, sound, vibration, temperature, repeatability, and any other process-critical result. The numerical thresholds must come from the machine requirement and the selected maker’s recommendations; there is no universal acceptance number for all support units. Distinguish component inspection, assembled-axis test, and finished-machine test, and name an approver for each.

Collect the load case and budget for a retrofit

“Carried mass” on a machine specification is not the complete load case. Separate process reaction, external pressing force, force needed during holding, and acceleration. Record both normal production cycles and infrequent setup movements. Where a number is unknown, designate a measurement or calculation owner and make the quotation conditional. Define positioning measurement as well: where on the table is it measured, under which load and temperature, immediately after stopping or after settling, and how many repetitions? A bearing-unit certificate alone does not certify the finished axis.

Older equipment may hide dimensions until it is disassembled. Distinguish firm scope, scope to be confirmed by on-site measurement, and the agreed unit prices and approvals for unexpected machining. Include removal, transport, machining, remeasurement, and reassembly when a shaft end must be modified. Compare a preassembled spare axis against machining the existing shaft locally: the former may cost more in parts yet reduce downtime, while the latter may provide direct access to the actual geometry but extend shutdown. Decide from machine access and the production plan, without importing a generic price or lead time.

RFP field checklist

FieldInformation to record
Axis and purposeMachine ID, axis, failure recovery or performance improvement
Mechanical conditionsOrientation, stroke, load, speed, duty, temperature
DrawingsBoth shaft ends, support units, frame, guides, coupling
Materials scopeFixed and supported ends, accessories, spares, suppliers
Installation scopeAlignment, tightening, lubrication, shutdown, reassembly
InspectionReceiving, FAT, SAT, record form, approvers
Change controlDrawing revisions, substitutes, on-site machining approval

7. Use both FAT and SAT

FAT can verify model, revision, dimensions, shaft-end fit, included parts, hand rotation, and available bench or machine tests before shipment. It cannot prove performance on a customer frame and production load that were absent from the supplier’s site. Ask for recorded instruments, conditions, results, and open items, rather than a photograph marked “FAT complete.”

SAT checks the installed axis on the actual frame with the actual controller and load. Depending on the process, test no-load and production-load running, low and operating speeds, and cold and warm states. Record the full stroke, sound, vibration, temperature, position results, holding behavior, and safety-system interaction. Vertical-axis safety remains part of the machine’s safety design, not a bearing-unit checkbox.

StageCore evidence
ReceivingModel, revision, quantity, dimensions, condition
AssemblyDatum, alignment, tightening, full-stroke resistance
FATReproducible supplier-side conditions and deviations
SATOn-site loads, control profile, temperature and position logs
HandoverAs-built drawings, spares, service method, approvals
Ball Screw Support Bearing Units: Selection and Installation Guide for Thai Factories - figure 3

Agree on the response to a failed test before shutdown. Check the instrument and test condition, then separate alignment, tightening, lubrication, controller settings, and load. A component defect and a frame installation error have different owners. The retest condition, corrective deadline, and need to repeat FAT or SAT should be written into the purchase agreement. Keep instrument ID, calibration status, machine speed, load, temperature, drawing revision, operator, and date with each measurement.

8. Common mistakes and the commissioning sequence

The first mistake is reversing fixed and supported sides because their housings look alike. Mark the intended location at receiving and match it to the assembly drawing. The second is inferring shaft-end compatibility from nominal diameter. Inspect the shoulder and bearing seat in section. The third is treating the bearing unit as the only source of axis stiffness: measure frame, guide, screw, and table behavior before upgrading one part. The fourth is reusing tightening practices from a similar-looking model; use the exact current manual. The fifth is declaring site acceptance based solely on FAT despite a different frame, control profile, and load.

Start the project with a site survey and existing fault history. Draw the complete axis, request model-specific selections and shaft-end drawings, compare identical scope from vendors, and freeze the approved drawing revision before purchase. At arrival, verify the physical components before stopping production. During installation, check the mounting datum and full stroke in stages. At restart, record baseline sound, temperature, vibration, and position for maintenance. Maintain a common change log across engineering, purchasing, maintenance, controls, and contractors; photographs and part numbers make multilingual handover more reliable.

For an axis whose failure stops the entire line, a spare kit may need more than one support housing. Check whether it must include the ball screw with the correct machined ends, locknut, coupling, special tools, approved drawings, tightening instructions, and post-replacement measurement method. Control storage condition to prevent dirt, impact marks, and corrosion, and track the revision of stored parts. Otherwise a stocked spare may still be impossible to install during a breakdown.

9. A practical rollout and maintenance plan for a Thai factory

The first step is a site survey, not a purchase order. Gather the machine’s fault history, production downtime window, current drawings, and any earlier shaft-end repairs. Note what can be measured while the line runs and what requires disassembly. If a critical dimension is hidden until the axis is removed, state that uncertainty in the RFQ and define who will measure it during the shutdown. A fixed price based on an unverified old drawing can become a costly variation when machining begins.

The second step is to put all disciplines on one approved axis drawing. Production engineering should state whether the purpose is failure recovery, longer life, better position quality, or higher speed. Maintenance should check access and replacement method. Purchasing should compare identical supply and installation scope. Controls engineering should supply the motion profile and homing behavior. An external installer should confirm frame machining and the shutdown plan. Link the screw, both supports, frame, and coupling to one revision record. If a substitute is proposed, repeat the interface check rather than approving it on price alone.

The third step is to compare shutdown methods. A preassembled spare axis may cost more in components but reduce the on-site changeover. Removing the existing shaft for local end machining can simplify measurement but extend downtime. Neither method has a universal price or duration: access, lifting, machining capacity, and production planning decide. Separate work that can be quoted before inspection from work contingent on site measurements, and set a written approval path for additions.

After SAT, establish a baseline that maintenance can repeat. Record sound, housing temperature, vibration, position, load, speed, measuring point, and ambient conditions. If the axis becomes noisy at one stroke location, investigate alignment or a local screw/guide issue; if it changes through the whole stroke, investigate support, lubrication, or control as well. These patterns guide inspection but do not diagnose a bearing failure on their own. Store installation photos, tightening records, lubrication details, drawings, and the exact installed part revisions with the asset record. Changes to acceleration, carried mass, lubricant, frame, or tooling can change the support’s duty; review the original selection and acceptance results when those conditions change.

Before each replacement, inspect the new approval drawing in a fixed order: revision and bill of material, fixed-end shoulder and bearing seat, supported-end geometry, center height from the mounting datum, bolt access, and accessory ownership. Confirm that the shaft, support, and frame drawings refer to the same approved combination. A missing dimension is a design query, not a decision for the installer during shutdown. This check makes procurement review concrete and prevents a fit problem from first appearing at the machine.

Summary

Select the fixed and supported ends as parts of a complete axis. Match machined shaft ends and mounting datums using approved sectional drawings; then evaluate load, stiffness, thermal behavior, access, and maintenance. Request quotations with a common component and installation scope, and agree on FAT and SAT before ordering. Exact dimensions and tightening requirements always come from the current documentation for the chosen model.

Need to define the support units, shaft interfaces, RFP, and acceptance plan for a Thai factory? Contact TOMAS TECH. Existing drawings, machine photographs, axis duty, and observed problems will help us define a practical survey and quotation scope.

FAQ

Can I buy two identical units for the two ends?

Do not assume so. Fixed and supported ends have different roles and commonly different bearing arrangements. Confirm the maker’s pairing for the exact screw and shaft ends.

Is nominal screw diameter enough to order the units?

No. Compare both machined ends, shoulders, seats, threads, center heights, mounting faces, and included accessories on approved drawings. Measure a modified existing shaft.

Is FKT automatically a better replacement?

No. THK presents high-load advantages, but actual suitability depends on load direction, shaft-end fit, frame, heat, and model-specific selection. Validate it on drawings and in FAT/SAT.

Can the supported end be omitted?

Only after evaluating shaft length, speed, orientation, and the manufacturer’s selection criteria. Treat removal from an existing design as a formal change.

What records should a Thai site keep?

Keep approved revisions, received models and dimensions, alignment and tightening records, full-stroke results, real-load position and temperature results, issues, corrections, and final approval.

Primary sources

Sources checked 10 November 2026. Reconfirm current model-specific drawings, ratings, and installation instructions before ordering.