Display Change
Projection Picking System The Projection Picking System is a state-of-the-art picking solution that utilizes image processing technology for flexible implementation. This system effectively supports picking operations in logistics cen…
RFID / Smart Card RFID (Radio Frequency Identification) and smart cards are systems that utilize wireless communication technology to identify items and individuals, enabling the management and tracking of various information. They ar…
Digital Picking System The Digital Picking System is a solution designed to enhance efficiency in parts picking processes and inventory management. This system utilizes light pick terminals to assist in the selection of components for…
Production Management / Production Planning System The Production Management System is an advanced management solution designed to meet the diverse needs of the manufacturing industry. In recent years, the manufacturing sector has fac…
Order Management System The Order Management System supports the entire workflow of office operations, from entering order data to order placement, achieving greater efficiency and accurate management. By integrating with inventory ma…
Process Management System The Process Management System enables the planning of production schedules, collection of actual performance data, and management of production progress based on order data. Additionally, by integrating with …
Unlocking System The Unlocking System is designed to mitigate the risks of material picking errors and incorrect material input in the manufacturing industry. When materials are fed into the molding machine, the tank is locked, and th…
Traceability System The traceability system is a framework designed to thoroughly record and manage the production, distribution, and sales pathways of products, detailing where they are produced and how they reach customers. This sys…
Energy Management System The Energy Management System is a tool designed to collect and analyze various energy consumption data in real-time within a factory. Utilizing a range of sensors throughout the facility, it digitizes detailed…
Visualization / IoT IoT (Internet of Things) in manufacturing involves connecting equipment and devices on the production floor to a network, enabling real-time data collection, management, and analysis. This technology aims to enhanc…