Display Change
Energy Management System The Energy Management System is a tool designed to collect and analyze various energy consumption data in real-time within a factory. Utilizing a range of sensors throughout the facility, it digitizes detailed…
Visualization / IoT IoT (Internet of Things) in manufacturing involves connecting equipment and devices on the production floor to a network, enabling real-time data collection, management, and analysis. This technology aims to enhanc…