Weight Measurement Support System
The Weight Measurement Support System is designed to wirelessly transmit measurement data from weighing devices to Handy Terminals, allowing for automatic recording and reflection of measurement results. This system reduces the need for manual data transcription after measurements, thereby enhancing operational efficiency and accuracy. Communication with the weighing devices utilizes either serial or Ethernet communication, and data is obtained through dedicated devices or PLCs, providing a flexible solution that accommodates a wide range of working environments.

Benefits
- Reduction of Transcription Errors
 The weight data is automatically transferred to the Handy Terminal, eliminating the need for manual data entry. This prevents human errors during transcription, thereby improving data accuracy.
- Improvement of Work Efficiency
 By omitting the data transcription process after weighing, the measurement operations can be conducted smoothly, significantly enhancing work efficiency. This also facilitates quick handling of multiple measurements.
- Real-Time Data Reflection
 Weight data is recorded in the Handy Terminal simultaneously with measurement, allowing for real-time verification of data. This enables immediate sharing of information and swift handover to the next process.
- Flexible Communication Methods
 The system supports both serial and Ethernet communication, enabling connections with various weighing devices. Additionally, using dedicated devices or PLCs allows for easy integration into existing equipment.
- Centralized Data Management and Visualization
 Measurement data can be centrally managed within the system, making it easy to reference and analyze historical data. This contributes to improved traceability and optimization of long-term production management.
 
		 
				 
																											 
																											 
																											