製造DXバナー
Projection Picking System - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援

Solution 17

Projection Picking System

The Projection Picking System is a state-of-the-art picking solution that utilizes image processing technology for flexible implementation. This system effectively supports picking operations in logistics centers and factory assembly lines, accommodating a wide variety of shelf and rack shapes. Equipped with mistake-proofing features, it enhances both accuracy and efficiency in the picking process. Additionally, it can be implemented in locations where installing a display unit is challenging, allowing for flexible deployment without traditional constraints. With the ability to provide diverse instructions through product names, quantities, images, videos, and audio, anyone can achieve precise picking.

Benefits

  1. Flexible Installation on Any Shelving or Rack
    By applying image processing technology, the system can be installed on shelves and racks of any shape. It offers the advantage of adaptability in locations where installing a display unit is challenging, allowing for use in diverse environments.
  2. Mistake-Proofing Features (Poka-Yoke) to Prevent Errors
    Equipped with a mistake-proofing function (Poka-Yoke), the system prevents progression to the next step until the correct task is completed. This reduces the risk of picking errors, enhancing accuracy and safety in operations, thereby allowing for efficient work while maintaining quality.
  3. Easy Installation Without Electrical Work
    The simple equipment configuration allows for installation without the need for electrical work. This ease of installation and modification reduces costs and time associated with implementation, enabling rapid operational commencement.
  4. Versatile Picking Instructions
    The system can display picking instructions through various methods, including product names, quantities, images, videos, and audio. This enhances the ability of workers to confirm instructions visually and audibly, improving their understanding of the tasks. With these visual and auditory aids, anyone can achieve precise picking with ease.
  5. Collaboration with Other Logistics Equipment for Increased Efficiency
    The system can operate in conjunction with logistics equipment such as conveyors. By maximizing the efficiency of the entire logistics process, it facilitates a smooth workflow, resulting in expected reductions in both work time and costs.