製造DXバナー
Production Management / Production Planning System - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援

Solution 14

Production Management / Production Planning System

The Production Management System is an advanced management solution designed to meet the diverse needs of the manufacturing industry. In recent years, the manufacturing sector has faced increasing demands for small-lot, multi-product production and quick delivery, resulting in the complexity of daily management tasks. The PEGASUS Production Management System addresses these challenges by centralizing inventory management and scheduling, thereby achieving operational efficiency and cost reduction.
Additionally, by digitizing and visualizing processes that were traditionally managed through whiteboards or Excel, it contributes to improving the overall performance of the manufacturing process. When integrated with the production planning system, it optimizes the entire workflow from procurement to production and delivery, enabling maximum utilization of resources.

Benefits

  1. Digitalization and Visualization of Management Operations
    By digitizing complex schedules and inventory management and visualizing them in real-time, management tasks are simplified. Centralized data management enables immediate comprehension of the overall situation on-site.
  2. Small-Lot, Multi-Product and Quick Delivery Support
    To respond to diversifying market needs, the system allows for small-lot, multi-product production and quick delivery. By meticulously managing schedules and formulating optimal production plans, rapid responses can be achieved.
  3. Inventory Reduction and Maximization of Resource Utilization
    By centralizing the flow from material procurement to production, appropriate inventory levels are maintained, leading to inventory reduction and efficient resource utilization. The use of features such as the “mountain-crushing” function and MRP enables timely supply of necessary materials.
  4. Cost Reduction
    The digitalization significantly reduces traditional analog management tasks, leading to efficient operations. By minimizing manual tasks and optimizing processes, management costs are reduced.
  5. Integration with Production Planning System
    The integration with the production planning system facilitates smooth management of processes from planning to actual performance collection. Utilizing time-based MRP and linkage logic enhances lead time reduction and improves planning accuracy.

Introduction Video