Solution 36

Paperless Inspection Record System

This system replaces paper inspection sheets with handheld terminal input — capturing measurements and judgments directly into the quality database in real time.

Benefits

Paperless records

Inspection records are captured digitally with no paper handling.

Real-time visibility

Quality data is visible to supervisors immediately.

Lower overhead cost

Removes paper, scanning and transcription costs.

Audit-ready quality data

Records are timestamped and centrally searchable.

Compatible Functions

  • Barcode / 2D code reading — Identifies products being inspected.
  • No-code app builder — Design inspection screens without coding.
  • Device management — Manage handhelds remotely.