製造DXバナー
Label Printing System - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援

Solution 08

Label Printing System

The Label Printing System is offered as an option for various Handy Terminal applications, supporting efficient label issuance in logistics and manufacturing environments. It can be utilized in a range of scenarios, from label generation during goods receipt, label updates during picking, to label issuance for process management. Both fixed and mobile label printers are available, providing the optimal solution tailored to on-site operational needs.

Benefits

  1. Flexible Label Issuance Options
    Labels can be issued at various stages of operations, such as during receiving, picking, and process management. This capability enables real-time information updates and enhances the accuracy of inventory management.
  2. Support for Fixed and Mobile Printers
    Depending on the needs of the site, users can choose between fixed or mobile printers. This flexibility allows for optimal placement that aligns with the operational environment and workflow, thereby improving work efficiency.
  3. Streamlining Business Operations
    By instantly printing and affixing labels with the necessary information, manual writing can be eliminated, significantly improving work efficiency. This is particularly beneficial for streamlining time-consuming label writing and attachment tasks.
  4. Prevention of Shipping Errors and Inventory Discrepancies
    Accurate label issuance ensures reliable identification of products and materials. This reduces errors during picking and shipping, thereby enhancing the quality of operations.
  5. Enhanced Traceability through Visualization
    The use of labels for visualization allows for real-time tracking of each process from receiving to shipping, improving traceability. Integration with databases enables quick access to essential information.

Introduction Video