Webinar Details
| Seminar Title | What Is the Difference Between Successful and Failed Cases! Learning from Case Studies of System Implementation in Thailand ~ The Flexibility Required in the Era of EV Transformation ~ |
| Date & Time | 9 March 2023 (Thursday) 13:30-14:30 (Thailand time) 15:30-16:30 (Japan time) |
| Event Format | Zoom Online Webinar *Participants who register via the form below will receive an invitation link |
| Guest Speakers | Sayaka Oide, CIMTOPS Co., Ltd. Yoshitaka Kamimura, Asprova Co., Ltd. |
| Organizer | Tomas Tech Co.,Ltd. |
| Co-organizers | CIMTOPS Co., Ltd. Asprova Co., Ltd. |
| Content | While the COVID-19 situation in China has ended and manufacturing industries are returning to normal, the ongoing natural disasters and the urgent issue of carbon neutrality remain a challenge. The attention on electric vehicles (EV), which is said to be a once-in-a-century revolution, is increasing. However, EV adoption faces many challenges, including infrastructure issues. This seminar will focus on the flexibility required in the EV transformation era and system implementation, with discussions from three companies that have expertise in Southeast Asia. |
| Agenda | Part 1 Topic: What Is the Difference Between Successful and Failed Cases! Learning from Case Studies of System Implementation in Thailand Speaker: Sayaka Oide, CIMTOPS Co., Ltd. / Yoshitaka Kamimura, Asprova Co., Ltd. / Ryo Nozaki, Tomas Tech Co.,Ltd. Part 2 Topic: Breaking Free from Excel! What Does Flexible System Implementation Look Like? Speaker: Sayaka Oide, CIMTOPS Co., Ltd. Part 3 Topic: What does a Flexible Production Schedule Look Like in an Era of High-Volume, Multi-Type Manufacturing? Speaker: Yoshitaka Kamimura, Asprova Co., Ltd. |
| Cost | Free of charge |
| Language | Japanese |
| Seats Available | Unlimited |
Archived Videos
Part 1 Discussion Topic: What Is the Difference Between Successful and Failed Cases! Learning from Case Studies of System Implementation in Thailand Speaker: Sayaka Oide, CIMTOPS Co., Ltd. / Yoshitaka Kamimura, Asprova Co., Ltd. / Ryo Nozaki, Tomas Tech Co.,Ltd.
Part 2 Topic: Breaking Free from Excel! What Does Flexible System Implementation Look Like? Speaker: Sayaka Oide, CIMTOPS Co., Ltd.
Part 3 Topic: What does a Flexible Production Schedule Look Like in an Era of High-Volume, Multi-Type Manufacturing? Speaker: Yoshitaka Kamimura, Asprova Co., Ltd.
