PR

2024.11.20

TOMAS TECH Showcases Smart Factory IoT Monitoring and Energy Visualization at METALEX 2024

TOMAS TECH、METALEX 2024にてスマートファクトリーIoTモニタリングとエネルギー見える化を展示

METALEX 2024 Exhibition Report

TOMAS TECH showcased its smart factory IoT monitoring and energy visualization solutions at METALEX 2024, held from November 20 to 23, 2024 at BITEC, Bangkok, in the YN2 Tech booth. The exhibition introduced visualization of machining line status, production counts, equipment operation, electricity consumption, and factory infrastructure such as air compressors. By making both production equipment and utility data visible, the solution supports productivity improvement, energy cost reduction, and more sustainable factory operations.