PR

2025.06.18

TOMAS TECH Exhibits Machine Visualization and Energy Monitoring at Manufacturing Expo 2025

TOMAS TECH、Manufacturing Expo 2025にて設備見える化とエネルギー監視モニタリングを展示

Manufacturing Expo 2025 Exhibition Report

TOMAS TECH exhibited smart factory solutions at Manufacturing Expo 2025, held from June 18 to 21, 2025 at BITEC, Bangkok, across multiple booths. At the PATLITE booth, TOMAS TECH demonstrated machine visualization using IoT signal towers connected to PEGASUS dashboards, with alerts sent to smartphones and smartwatches when abnormalities occur. At the JETRO booth, together with YN2 Tech and Kyokko Electric, TOMAS TECH introduced an energy monitoring system that collects power consumption data, sends it through PLC and server/cloud infrastructure, and visualizes historical energy data for analysis.