PR

2023.06.21

TOMAS TECH Showcases Machine Monitoring System with Smartwatch Alerts at Manufacturing Expo 2023

TOMAS TECH、Manufacturing Expo 2023にてスマートウォッチ通知対応の設備モニタリングシステムを展示

Manufacturing Expo 2023 Exhibition Report

TOMAS TECH exhibited its machine monitoring system and smartwatch notification solution at Manufacturing Expo 2023, held from June 21 to 24, 2023 at BITEC, Bangkok, in the PATLITE booth. The solution connects signal tower status with a monitoring display and sends alerts to a smartwatch when an abnormal signal occurs. By notifying operators and maintenance staff away from the line, the system helps reduce response delays, visualize equipment status, and record who responded to which error and how long the action took. TOMAS TECH will continue supporting manufacturers in Thailand with practical IoT solutions for machine visibility, alerts, and maintenance improvement.