This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.
 
		 
				