This system wirelessly transmits weight data to Handy Terminals, improving the efficiency and accuracy of measurement operations and reducing manual transcription work.
Document Download
This system wirelessly transmits weight data to Handy Terminals, improving the efficiency and accuracy of measurement operations and reducing manual transcription work.
Please download using the button below.