Document Download

PEGASUS Pokayoke System Cover TH

PEGASUS Weight Measurement Support System Detailed Documentation TH ver.

This system wirelessly transmits weight data to Handy Terminals, improving the efficiency and accuracy of measurement operations and reducing manual transcription work.

Please download using the button below.