This system verifies the correct data during material input and only unlocks when the data matches, preventing incorrect inputs and enhancing the accuracy of operations.
Document Download

This system verifies the correct data during material input and only unlocks when the data matches, preventing incorrect inputs and enhancing the accuracy of operations.
Please download using the button below.