製造DXバナー
PEGASUS Energy Management System Detailed Document Japanese ver. - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援

Document Download

PEGASUS Energy Management System Detailed Document Japanese ver.

This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.

Please download using the button below.