Case Study List

Sanko Mold and Plastics (Thailand) CO.,LTD.
1. Wanted to eliminate manual inventory management to avoid human errors.
2. Needed to monitor inventory status in real-time to streamline production planning.
3. Aimed to prevent mistakes in delivering different products.
PEGASUS Inventory System
1. Achieved order point management to eliminate excess inventory and stockouts.
2. Successfully improved production planning efficiency by ensuring strict adherence to the first-in-first-out (FIFO) method, resolving overflow issues.
3. Enhanced work efficiency and accuracy by utilizing Handy Terminals during the inbound and outbound processes.
“Initially, we considered off-the-shelf software, but it was expensive, and we would have to adjust our business processes accordingly. In contrast, TOMAS TECH’s system offered customization. They conducted detailed interviews about our inventory management flows and requirements, allowing us to incorporate desired features into the software after multiple discussions. Since we could use Excel, which we are familiar with, directly in the program, the staff found it very intuitive.” — Managing Director, Mr. Nakajima