Blog

2026.11.09

Cavity-Level Production and Yield Tracking for Injection Moulding: Implementation Guide

Cavity-Level Production and Yield Tracking for Injection Moulding: Implementation Guide

When considering the introduction of a “production performance management system” for injection molding, the first point to confirm is whether it is acceptable to automatically calculate the number of accepted units from the molding machine’s shot count. In multi-cavity molds, the quality status can differ for each cavity within a single shot. There are days when production continues with some cavities blocked. Simply multiplying the shot count by the designed number of cavities does not distinguish between inspected accepted units, quarantined/held products, and rejects. This article, with Thai molding plants in mind, organizes the implementation steps for linking cavity IDs and shots, reconciling quantities, and connecting to mold maintenance, MES, and ERP.

On-Site Issues Necessitating Cavity-Based Performance Tracking

For example, if you record 1,000 shots with an 8-cavity mold, the simple theoretical output is 8,000 units. However, if cavity 2 was blocked partway, cavity 6 was on hold due to flash, and the last 100 shots were for startup adjustments, the figure of 8,000 is meaningless as a shippable quantity. The molding machine’s counter reflects the actual cycles, but does not indicate the acceptance status of parts from each cavity. What is needed on the shop floor is a continuous record of “when, which mold, which cavity was active, how many units were taken from each shot, and how many passed inspection.”

With handwritten daily reports, it is possible to reconcile the total shot count and box quantities after a shift. However, if a defect in a specific cavity is discovered only after several hours, it becomes difficult to pinpoint the affected time period, boxes, and items requiring re-inspection. Generic dashboards that only display daily yield rates can also mislead if it is unclear whether the denominator includes inactive cavities or items pending inspection. The starting point for implementation is not the screen, but the definition that aligns the physical number of units taken with the accounting quantity.

The basics related to this are covered in Injection Molding Production Management Systems. This article focuses specifically on designing performance and yield tracking with shots and cavities as the smallest units.

Five Quantities to Distinguish First

If the term “production quantity” is used interchangeably between processes, discrepancies will arise between shop floor and ERP figures. At minimum, separate fields should be maintained for: ① completed shot count, ② theoretical output, ③ confirmed units taken, ④ accepted units after inspection, and ⑤ rejects, rework, and quarantine/hold quantities. Completed shots are counted by the molding machine’s cycle counter; theoretical output is the expected value calculated from the set of active cavities per shot. Confirmed units taken are observed values substantiated by robots, cameras, or operator checks that the workpiece actually existed. Accepted units after inspection are only finalized after quality judgment.

The denominator for “yield rate” also varies by application. To assess process capability, use the theoretical output from active cavities as the baseline; to evaluate inspection process yield, use the inspected quantity as the baseline. Avoid displaying both under the same label; instead, clearly indicate “theoretical yield rate” or “inspected acceptance rate.” Quarantined/held items are neither rejects nor accepted units—they are inventory pending judgment. Accepted units after rework should be recorded as an update to the original product’s status, not as new production; otherwise, performance figures will be double-counted.

ISO 22400-2 defines KPIs for manufacturing operations management, specifying formulas, components, units, and time-based behavior. The standard does not mandate a uniform cavity-based yield formula for all companies. Therefore, when implementing a system, first agree internally on how to handle “one unit,” quarantine/hold, and time boundaries, and apply the same formula to screens and reports. While referencing the ISO 22400-2 original text, it is safest to fix the formula independently as part of the specification.

How to Link Shot IDs and Cavity IDs

The smallest event key is “factory, molding machine, production order, mold, shot serial number, and timestamp.” The shot serial number should not be used as a unique key by itself, as it may be reset by power cycling or mold changes; combine it with an operation session ID. For each shot, link the mold version, product part number, cavity layout, and active/blocked status at that time. Cavity IDs should not rely solely on visual positions like “top left,” but should be assigned immutable numbers corresponding to the mold drawing. It is important that on-site labels, inspection terminals, and maintenance records all use the same numbering.

If you can record details for each shot such as “cavity 1: accepted, cavity 2: blocked, cavity 3: visual defect, cavity 4: pending inspection,” you can recalculate trends by time period and cavity. Conversely, if only the total accepted units for a shift are saved and later allocated to cavities, there will be no evidence of how many units each cavity produced. For products requiring full unit-level traceability, the design should allow identifiers to be carried from extraction position to tray, box, and lot. For micro-molded products where individual labeling is not possible, at minimum, link the shot range and container, and adjust the traceability granularity to customer requirements.

Cavity-Level Production and Yield Tracking for Injection Moulding: Implementation Guide - figure 1

EUROMAP 77 defines the data exchange interface between injection molding machines and MES. However, just because a machine is compliant does not guarantee it provides cavity-level quality data. Confirm the supported nodes, implementation profile, update cycle, and meaning of counters on the actual machine. The draft specification for EUROMAP 79 describes a mechanism for passing cycle information and cavity-level quality details from the molding machine to the robot, but again, confirmation of supported models and implementation status is necessary. Do not simply list the standard name in the requirements document—have the vendor demonstrate the “values that can be obtained.” EUROMAP 77, EUROMAP 79 draft specification.

Manage Active and Blocked Cavities with History

If the mold master data only records “8-cavity,” blocked cavities will not be excluded from the denominator, distorting yield rates and capacity planning. On the other hand, simply overwriting the master cavity count from 8 to 7 when a cavity is blocked risks making all previous 8-cavity history appear as 7-cavity. What is needed is period-based management of active status. For each cavity, record the start shot, end shot, reason for change, and approver, and recalculate the theoretical output only for that interval.

Reasons for blocking should be coded to match actual shop floor conditions, such as short shot countermeasures, pin breakage, maintenance pending, or trial conditions. If operators can register blocks with arbitrary free text, the same failure may be scattered under different names during analysis. However, if the reason code options are too detailed, input will be delayed, so start with several common types and “other + comment.” Unblocking should be recorded as the start of a new active period, without altering past performance records.

Changes in the number of active cavities also affect production planning. The required number of shots to meet order quantity should be estimated based on the expected number of active cavities and yield rate, not the designed 8-cavity count. However, planned values are forecasts and actual values are confirmed facts, and should be stored separately. If past shot records are overwritten due to plan changes, it becomes impossible to compare maintenance effects. EUROMAP 82.5 is a release candidate dealing with operational data models for molds and is useful for considering mold identification and status integration. It does not mandate implementation or automatic generation of cavity-level performance records.

Reconciling Physical Units and Quantities in Inspection, Ejection, and Packing

Between the completion of a shot on an injection molding machine and the number of units placed in the accepted parts box, there are multiple branching points. This is because there may be workpieces that the robot failed to pick up, workpieces left on the runner side, workpieces that fell into the ejection chute, workpieces held for appearance inspection, or workpieces mixed on the workbench. The system separates “theoretically generated” from “actually confirmed” units, displaying any discrepancies as unresolved. Designing the system to automatically classify discrepancies as rejects can conceal the possibility that missing products have been mixed into the accepted parts box.

In practice, after collecting observation results by shot and cavity, the total of “accepted parts box, quarantine/hold box, scrap box, and in-process remainder” is reconciled at the point when the container is closed. If it is difficult to make a complete judgment for each shot, combine box-level scanning with cavity-specific ejection routes and record the level of certainty achieved. Box labels should include production order, mold ID, start/end shot numbers, shift, quantity, and judgment status. If box opening or transfer is permitted, the relationship between the original and new boxes should also be recorded as an event.

An example reconciliation formula is: “Number of confirmed ejections = number of accepted units + number of rejects + number of units on hold + number of in-process remainders.” If this is not satisfied, closing the shift is put on hold, and the range of shots where discrepancies occurred, responsible personnel, and corrective actions are checked. Corrections to numerical values are not overwritten; instead, the original event, correction event, reason, and approver are linked. NIST has published practical guidance to ensure traceability and trustworthiness of manufacturing-related data. However, injection molding is not included in the processes covered by that report. The audit trail design in this article is a proposal that applies the general concepts of that document to injection molding. NIST AMS 300-10.

Cavity-Level Production and Yield Tracking for Injection Moulding: Implementation Guide - figure 2

Tracing Reject Reasons Back to Cavity and Shot Range

A simple tally such as “100 rejects” does not provide enough information to determine which part of the mold needs repair. Register reasons such as flash, short shot, sink mark, burn, out-of-spec dimensions, and contamination in a unified dictionary by cavity, and record the inspection time and original shot range. For products with multiple defects, separate the primary and secondary defect reasons, and establish rules to avoid double-counting a single unit in quantity aggregation. When using judgment codes from image inspection devices, it is important to map each device’s codes to a common dictionary and not silently classify unmapped judgments as accepted units.

The time a defect is discovered does not necessarily match the molding time. If a defect found hours later in a downstream inspection is attributed to the molding machine’s operation at that later time, causality will be misrepresented. Use containers, trays, and shot ranges to trace back to the original operating conditions and cavity. For customer returns, which may be discovered days later, it must be possible to trace from the product lot back to the mold used, mold revision, resin lot, and production order. However, the granularity at which individual units can be traced depends on the process and the feasibility of labeling. Do not describe as “complete traceability” in sales materials if such granularity cannot be achieved.

Cavity pressure waveforms are a powerful input for early detection of molding condition abnormalities, but the fact that a waveform was within tolerance does not guarantee that the product from that cavity passed final inspection. The article on cavity pressure monitoring covers sensors and waveform judgment, while this article focuses on confirming actual physical quantities and judgment results as production records. If linking both, record pressure alarms as a reason for “inspection required,” and distinguish them from final quality judgments.

Key Indicators and Judgments for Mold Maintenance

Viewing defect rates by cavity over time allows observation of whether specific cavity defects are recurring. However, if maintenance is automatically triggered based solely on defect rates, the effects of material changes, condition changes, or inspection criteria changes may be overlooked. Analysis screens should overlay mold revision, resin lot, molding machine, setting conditions, blocked periods, and maintenance history, allowing comparison of periods under the same conditions. When evaluating improvement after maintenance, clearly state not only the number of cases but also the effective number of shots as the denominator.

The mold maintenance workflow should track from alert to work order, disassembly, cleaning, parts replacement, test shot, and return-to-service approval. For example, if flash increases beyond a certain threshold in cavity 3, the system presents the trend and related shots for that cavity, the quality team determines the re-inspection range, and the maintenance team inspects the mold—each with their respective roles. Thresholds should be adjusted for each material and product, and during initial implementation, false positives and misses should be verified by personnel. Fix the comparison period and target cavities before and after maintenance to ensure the basis for improvement can be explained.

For company-wide mold ledgers and lifetime/repair histories, see also Key Points for Introducing Mold Management Systems. When linking cavity-specific results to the maintenance ledger, confirm not only that the mold number matches, but also that the revision and cavity numbering schemes are consistent. If cavity numbers change due to insert replacement, maintain a historical correspondence table between old and new numbers.

Defining Roles Between MES and ERP

Raw data from molding machines, robots, and inspection terminals should be received as events by the MES, which completes quality judgments and reconciliation at the container level. The ERP should receive only finalized accepted quantities, scrap, rework quantities, and order progress. Sending all raw shot-by-shot events to the ERP complicates reconciliation with later quality judgment corrections, increasing both system load and operational complexity. Conversely, sending estimated accepted quantities not yet finalized in the MES to ERP inventory can result in inventory that does not physically exist.

ISA-95 clarifies the boundary between Level 3 (manufacturing execution) and Level 4 (business planning and logistics). This boundary does not dictate the location of physical servers, but is useful for dividing business responsibilities. Production orders, part numbers, and planned quantities are sent from ERP to MES; cavity-specific results, accept/reject/hold status, and corrective histories are managed in the MES; finalized quantities and completion status are returned to the ERP. Official ISA-95 Explanation.

Cavity-Level Production and Yield Tracking for Injection Moulding: Implementation Guide - figure 3

During implementation, include in the contract the event ID, transmission order, retransmission method, and ERP-side receipt confirmation to prevent duplicate transmissions for the same order. Also confirm whether local terminals can accumulate data during network outages and synchronize while maintaining chronological order and avoiding duplication after recovery. If there is no need to write data to the molding machine, design data acquisition as read-only, and do not allow the MES to control machine safety functions. NIST SP 800-82 Rev.3 covers security measures and network segmentation considering OT availability and safety. The policy for connecting shop floor and enterprise networks should be decided jointly with the machine manufacturer and internal OT personnel. NIST SP 800-82 Rev.3.

On-Site Checks Before Selecting Measurement Equipment

Not every factory requires the same sensor configuration. For each piece of equipment, check whether the molding machine can output cycle events and mold ID, whether the robot can identify and pick by cavity position, whether the product can be distinguished by cavity from the gate or runner, and whether all units can be confirmed by camera before boxing. In processes where physical cavity identification is impossible, do not display cavity-specific accepted quantities as “measured” by software alone. In such cases, add positioning jigs, robot coordinates, vision systems, or tray positions, or clearly indicate estimated values and implement in stages.

When taking inventory of equipment, check not only model and year of manufacture, but also communication licenses, available protocols, data update cycles, time synchronization, and counter behavior after power outages. Even for EUROMAP 77-compliant machines, the scope of implementation must be checked individually. For older equipment, options include capturing shots via PLC signals or external counters, but verify during FAT whether the signal represents “mold open” or “molding complete.” If failed mold openings or dry cycles are counted as completed shots, quantity reconciliation will be chronically inaccurate.

While minimizing manual input, it is essential not to eliminate exception handling. For blocking/unblocking, defect reason corrections, and box transfers, responsible personnel and timestamps are required. Input screens on terminals should consider glove use, Thai language display, power outages, network disconnections, and night shift lighting conditions. If using barcodes, test label readability when contaminated with resin powder or oil. Before creating convenient screens, map out in process diagrams which observations are automated and which depend on human confirmation.

Dividing Implementation into Three Stages

The first stage is to verify the linkage between shots, active cavities, boxes, and inspection judgments using a single molding machine, one multi-cavity mold, and one part number. Connecting all machines from the start will expose differences in machine types, inspection processes, and label operations all at once. The initial success criterion is not “numbers appear on the screen,” but that manual counts and event logs match per shift, and that discrepancies can be traced back to the relevant shot range. If production and quality teams can explain counts while looking at the same box, expansion to additional equipment can proceed.

The second stage adds exceptions such as blocked cavities, mold changes, rework, and downstream defect discovery, and tests integration with maintenance. Confirm whether the denominator changes when a cavity is blocked, and whether results prior to the change are preserved. Test in practice whether defects discovered in the next shift can be traced back to the original shot, and whether units are not double-counted when hold status is released. In the third stage, proceed with ERP integration and multi-equipment rollout, standardizing terminal operation, maintenance contracts, backups, and training materials.

Measure the effects of implementation based on “what was previously invisible.” For example: time required to close a shift, number of unresolved quantity discrepancies, time to detect cavity-specific defects, number of recurrences after maintenance, and time to narrow down affected boxes during customer complaints. Without establishing a pre-implementation baseline, improvement rates cannot be claimed later. In cost-effectiveness estimates, do not equate theoretical scrap reduction directly with profit; include costs for inspection labor, equipment downtime, software maintenance, labels/terminals, and data integration.

Specifications to Include in the RFP and Vendor Comparison

In the RFP, do not simply state “want to see yield by cavity,” but also include the minimum data model, quantity formulas, exceptions, integration targets, and acceptance criteria. In particular, providing sample data for the following three scenarios will reveal differences in vendor proposals: “number of active cavities changes between shots during production,” “inspection results are finalized later,” and “one box contains multiple shot ranges.” For equipment that cannot obtain actual cavity-specific counts, request separate estimates for proposals including additional devices and for those starting with estimated values.

Item to ConfirmContent to Specify in RFPWhat to Request in Demo
IdentificationShot ID, mold revision, cavity ID, box IDTrace back from a single box to the original shot range
QuantitySeparate theoretical, ejected, accepted, hold, and scrap countsRecalculate denominator before and after cavity blocking
ExceptionsDry cycles, re-inspection, rework, box transferRetain correction history without double-counting
IntegrationMolding machine, robot, inspection, MES, ERPRecovery from communication loss and duplicate elimination
OperationAuthorization, time synchronization, audit trail, multilingualDemonstrate shift closing on Thai language screen

For quotations, confirm whether the license unit is “machine,” “terminal,” “mold,” “user,” or “site,” and clarify conditions for additional charges. List separately any costs for connecting existing machines, PLC programming, robot modifications, image inspection, ERP API, on-site commissioning, training, maintenance, and cloud communication. Distinguish between standard features and custom development, and include in the contract who will set cavity layouts when adding molds in the future. Even with low initial costs, if vendor work is required each time, operational costs will increase.

Acceptance Testing That Cannot Be Overlooked in FAT and SAT

In FAT, even before connecting to actual equipment, verify quantity calculations and exception handling using simulated shot data. Test scenarios such as blocking 1 out of 8 cavities, mid-process unblocking, dry cycles, communication delays, duplicate events, downstream defect discovery, and changing hold to accepted, and check that expected values match those on screens, output CSVs, and APIs. Clearly state which shift includes shots that cross boundary times. If calculation formulas are hidden only in the vendor’s internal specifications, they cannot be explained in future audits, so receive the formulas and test data at acceptance.

SAT is verification using actual factory items. Test the correspondence between robot pick positions and cavity IDs, order of placement in boxes, barcode reading, counter behavior after power outages, retransmission after communication loss, night shift handovers, and delayed judgments in the inspection room. Run manual counts and the system in parallel over several shifts, recording the causes of discrepancies. If the acceptance criterion is set only as a total tolerance such as “within 1%,” misclassification of specific cavities may be overlooked. Use agreement by cavity and by box as the standard, and clearly indicate any unobservable ranges before acceptance.

At go-live, record the final timestamp of old forms, the starting shot of the new system, open boxes, and carryover hold items. Without this, the same product may be duplicated in both the old forms and the new system, or may be missing from both. Also establish authority and procedures for correcting past data after switchover, and procedures for retransmitting events after recovery from backup. Do not reduce FAT and SAT to mere “functionality checks”; verify whether accountability for quantities can be fulfilled on the shop floor.

Operations for Daily Decision-Making Using Actual Performance Data

Even after implementing a system, simply digitizing daily reports will not lead to early detection of defects. The daily review screen should display not only the total yield rate from the previous day, but also the number of defects per cavity, differences from the previous shift, blocked cavities, and boxes pending reconciliation. What operators need is a display that clearly shows the “next action.” For example, if “burrs are increasing in cavity 4, hold the last three boxes, and contact mold maintenance,” the system should be structured to enable a smooth transition from numerical data to corrective action. For managers, the system should allow comparison of the same mold on different molding machines and trends before and after maintenance. However, since rates can fluctuate greatly when the number of cases per cavity is small, both the count and the number of relevant shots should be displayed alongside the rate.

At the end of each shift, it is important not to allow operators to enter unexplained “adjustment numbers” just to make the numbers on the terminal screen match. Discrepancies may be caused by missed observations, misreading box labels, incorrect registration of blockage times, pending inspections, or actual losses. If discrepancies are simply balanced without identifying the cause, it will be impossible to narrow down the scope of investigation if defects are discovered later. Unresolved discrepancies should be carried over to the next shift as “unresolved,” and a responsible person should set a deadline for investigation. If corrections are required, the original record should be retained, along with the reason for correction and approval.

In weekly improvement meetings, do not only track the “top molds by defect count,” but also analyze which cavities repeatedly produce the same defect and how trends change after each maintenance activity. If you only look at the yield rate excluding blocked cavities, the rate may appear artificially high as more cavities are stopped. Therefore, also present the effective cavity rate, blockage time, and the actual number of accepted units relative to theoretical capacity. This allows you to judge whether short-term blockage to improve rates is putting pressure on delivery schedules or equipment capacity.

Defining Data Quality and Responsibility Boundaries

A single error in cavity number can lead to incorrect maintenance targets. After setting up a mold, make it standard procedure to perform an initial check by cross-verifying the drawing number, mold-side engraving, robot gripping position, and inspection camera image position. Repeat the same checks after changing inserts, after modifications, or after moving the mold to another molding machine. Limit system master data editing privileges to designated personnel, and only resume mass production after confirming that cavities and workpieces match using trial shot data after changes.

Timestamps are also critical. If machines, robots, inspection terminals, and MES each use different clocks, events for a single workpiece may appear out of order. During system design, confirm synchronization to a common time source, time zone notation, terminal clocks during communication outages, and whether daylight saving time is used. For example, screens in Thai factories may display time in ICT, but data should be stored in UTC via integration APIs—clearly specify the standards for storage and display. If timestamps are corrected later, retain both the original receipt time and the corrected time to facilitate investigation.

Clarify roles on the shop floor as well. Production staff verify the correspondence between boxes and shots, quality staff make judgments and release holds, and maintenance staff register mold status. IT staff monitor system integration and user permissions. While it may seem convenient to allow one person to edit all numbers later, this makes it unclear who confirmed which facts. Assign approval authority according to process, and establish proxy approval procedures and emergency contacts for holidays to ensure smooth operations.

Common Pitfalls in Cost Estimation and Investment Decisions

System costs are not determined by software licenses alone. You may also need work to acquire signals from older molding machines, robot program modifications, inspection cameras, box labels and printers, wireless infrastructure, ERP integration development, and on-site training. In estimates, specify not only the number of target machines, but also the types of molds, maximum number of cavities, frequency of part number changes, and inspection process branches. If you do not clearly indicate where complexity increases, post-order change costs can balloon.

When estimating return on investment, do not assume scrap reduction amounts from the outset. First, confirm whether current scrap volumes and their causes are being measured accurately. If cavity-level records enable earlier defect detection, smaller quarantine batches, and faster mold maintenance decisions, measure the time and quantity differences before and after implementation for each. Costs should also include maintenance of measuring instruments, labels, system operation, backups, and cybersecurity measures. For molds with low production volume, simple box-level tracking may be more practical than full cavity-level tracking. The criteria for selecting investment targets should be based not on theoretical high functionality, but on customer requirements and the actual losses that can be reduced on the shop floor.

When comparing vendors before placing an order, look beyond the appearance of the screens they present—check whether data can be exported, whether calculation formulas can be managed with change history, and whether the same procedures can be rolled out to additional equipment. If you cannot extract shot, cavity, judgment, and box histories when switching to another MES in the future, you will lose the ability to analyze maintenance and quality. Treat data ownership, retention periods, and backup extraction methods as contractual deliverables to preserve your options after implementation.

Do Not Confuse Full Inspection with Sampling Inspection

For some products, every item undergoes full image inspection, while for others, only sampling inspection is performed. If you unconditionally record both results in the same “number of good products” column, you end up mixing facts confirmed by inspection with process-based assumptions about uninspected products. In full inspection, confirm whether the judgment for each workpiece can be traced back to its original cavity and shot. In sampling inspection, record the number of samples inspected, the extraction method, the judgment unit, and the range of shots covered, and ensure that uninspected products are not marked as “inspection passed.” Clarify who is responsible for shipment decisions in accordance with the guarantee level required by the customer and your internal quality procedures.

It is also important not to automatically pass items as good products when the inspection device fails to read them. Cases where judgment is not possible due to camera contamination, changes in lighting, or misalignment of parts should be held as “unable to judge,” separate from quality defects, and a re-inspection route should be provided. After re-inspection, update the original workpiece records, but do not add the number of re-inspected items to the new molding results. If it becomes impossible to identify which cavity a workpiece came from, it is safer to temporarily isolate the relevant box and record the traceable range, rather than allocating it to a cavity based on estimation. By testing even the handling of such unjudged or isolated items, you can avoid systems that only superficially improve yield rates.

Frequently Asked Questions

Can cavity-level yield in injection molding be calculated using only shot counts?

Shot counts alone cannot distinguish between the periods when each cavity was active, workpiece removal, inspection judgments, or defects found later. While they can be used to calculate theoretical output, separate observations and reconciliations are required to confirm the actual number of shippable good units. If there is no cavity-level observation, display the result as “estimated” and do not mix it with actual numbers.

Are pressure sensors required for every cavity?

If you only need to know the production quantity per cavity, pressure sensors are not necessarily required. Cavity identification may be possible using robot position data, vision inspection, or fixture/tray position management. While pressure sensors are useful for condition monitoring and early anomaly detection, their role is different from final good/reject and quantity recording. The required detection capability should be verified for each product and equipment.

Can this be implemented even if existing molding machines do not support EUROMAP 77?

It may be possible. You can consider methods such as acquiring cycles via PLC signals or external data collection devices. However, be sure to confirm on the actual equipment what constitutes a completed shot, time synchronization, resets, dry cycles, and resumption after machine stops. Cavity-level good/reject data may need to be obtained via a separate route. Compliance with communication standards and the ability to measure the required quantities are not the same thing.

Should cavity-level data be stored in MES or ERP?

Generally, it is easier to manage detailed events, judgments, and reconciliation in MES, and confirmed quantities and order progress in ERP. However, this may vary depending on the responsibility boundaries of existing systems. The important points are not to confirm the same quantities separately in both systems, and to establish the main system and retransmission procedures for corrections.

What should be the acceptance criteria for the initial PoC?

Set acceptance criteria such that, for a single mold over multiple shifts, cavity-level and box-level actual results match manual counts, and that histories remain correct even when including blocked cavities and post-process defects. If only total quantities match, cavity number mix-ups may go undetected. Define sample cases including exception handling in advance and share the acceptance test sheet with the vendor.

Summary

The value of cavity-level performance management in injection molding is not simply in making dashboards more detailed. It is in connecting active cavities at the time of shot, actual extracted units, inspected good units, and quarantined/rejected units under a unified identification system, so that quantity discrepancies can be explained. For initial implementation, focus on a single machine and mold, standardize cavity IDs and quantity formulas on the shop floor, and verify exceptions during FAT and SAT. Once this is established, you can expand to maintenance ledgers, MES, and ERP, minimizing the risk of mixing estimates with inventory.

If you are at the stage of determining how much cavity-level performance data can be obtained from existing molding machine signals at your factory in Thailand, or whether additional robots or inspection terminals are needed, please consult TOMAS TECH. We can review your target molds and current forms together to clarify what facts can be captured, which numbers remain estimates, and the scope of phased implementation.

Reference Information