Blog

2024.11.22

i-Reporter is the best DX tool in Japan

Conclusion

By using i-Reporter,
・You can streamline the time involved in creating forms
・Zero errors in form entry/transcription
・Costs related to paper, printing, and management can be reduced
・Because it can support multiple languages, reporting and consultation will be smooth.
・Customers can create reports without code

Isn’t there a growing trend toward digitization and DX at manufacturing sites? However, many of our customers may be worried, “I don’t know where to start” or “I don’t know what to do.”

This time, it is recommended for expatriates who are active overseas. We will propose a DX plan that is easy to make and the strongest cost performance.
It is a proposal to switch the paper forms used in the field to tablets and digitize them.
In addition to reducing paper costs, printing costs, and administrative costs, there are various benefits such as shortening work time by recording on paper, preventing valuable and transcription errors, and facilitating communication.

We will explain the problems and effects before introduction in an easy-to-understand manner.
 

Table of contents ∇
1 What’s i-Reporter?
2 Issues at manufacturing sites
2.1 Problems when filling out forms
2.2 Enormous man-hours for post-processing
3 What we can do with i-Reporter
3.1 Four features of i-Reporter
3.1.1 Feature①  Very easy form creation
3.1.2 Feature②  Can be used even in an offline environment
3.1.3 Feature③  Centralized management of form data
3.1.4 Feature④  Linkage with external systems and measuring instruments is possible
3.2 10 representative functions of i-Reporter
3.2.1 Function① Various data input formats
3.2.2 Function② Data entry error checking
3.2.3 Function③ Change cell color
3.2.4 Function④ List selection formula input
3.2.5 Function⑤ Automatic time calculation
3.2.6 Function⑥ Various check inputs
3.2.7 Function⑦ Easy keyboard input
3.2.8Function⑧ Approval request flow
3.2.9Function⑨ Photo shoot/freehand
3.2.10 Function⑩ Barcode/QR code scanning
4 Summary: Utilization of i-Reporter at Manufacturing Sites

What’s i-Reporter?

i-Reporter is a tool that can digitize and paperless various on-site reports in all industries, and has been introduced by more than 3,000 companies! It is the No.1 share application among paperless apps.
Familiar paper and Excel forms can be turned into electronic forms on the Tablet as they are.
It can digitize and go paperless while keeping the goodness of handwritten paper forms.We will digitize the paper work that we could not get out of until now, and complete the recording and reporting work on site.

Issues at manufacturing sites

At manufacturing sites where recording on forms is essential, there are many paper-related issues. Enter paper forms on site and collect them at the office. Isn’t there a lot of post-processing man-hours in the office?We observe the following four issues with the use of paper forms.

Problems when filling out forms

Enormous man-hours for post-processing

What it can do with i-Reporter

Four features of i-Reporter

Feature① Very easy form creation

Creating electronic invoices is very easy. It can import the Excel of familiar on-site forms.

Feature ②  Can be used even in an offline environment

Since i-Reporter is a native application, it can be used even in an offline environment.

Feature③  Centralized management of form data

It is possible to centrally manage the form data in one database.

Feature④  Linkage with external systems and measuring instruments is possible

Data can be collected and linked with other external systems, measuring instruments, IoT devices, etc.

10 representative functions of i-Reporter

Function① Various data input formats

The date supports selection formula, entry from the calendar, automatic entry, etc.It also supports numeric keypad input.

Function② Data entry error checking

It is possible to control the input of unexpected numerical values and data.

Function③ Change cell color

It can change the text color, etc. when an error occurs, such as when the threshold value is incorrect.

Function④ List selection formula input

From multiple candidates, it can enter the determined numerical value and data by selection.

Function⑤ Automatic time calculation

It is possible to automatically calculate the time from the input time. In addition to time, calculation of input numerical values is possible.

Function⑥ Various check inputs

There are various check input methods such as circle, ellipse, check box, etc.

Function⑦ Easy keyboard input

Keyboard input is possible in Japanese, English, Thai, etc.

Function⑧ Approval request flow

Supports approval flow functions such as electronic staff and electronic signatures.

Function⑨ Photo shoot/freehand

It is possible to take photographs and attach drawings. You can also add freehand comments from the attached photos and drawings.

Function⑩ Barcode/QR code scanning

Barcodes and QR codes can be scanned, reducing the time and effort required to enter information.

Summary: Utilization of i-Reporter at Manufacturing Sites

i-Reporter can be used in a wide variety of ways at manufacturing sites.
It is possible to digitize all forms that are currently managed on paper.
By digitizing, it is possible to reduce the time required for entry and posting, which was previously consumed by writing paper forms.
In addition, it is possible to eliminate omissions and entry errors due to handwriting.
The language supports Japanese, English, and Thai, so if you store comments and note entries as digital data, you can read and understand them using translation tools such as Google Translate.
The most important feature of i-Reporter is that users can create and modify reports themselves. This makes it possible to digitize not only the manufacturing site but also all forms used by customers.

This is the strongest digital tool for cost performance.

Why don’t you consider using it as the first step of DX?