Download Partner List

  • IoT Traceability system domain

Electronic Document System i-Reporter Detailed Document Thai ver.

The i-Reporter system digitizes paper forms and Excel reports, contributing to improved operational efficiency and cost reduction by streamlining data entry processes on-site. …

  • IoT Traceability system domain

PEGASUS Smart Watch System Detailed Document Thai ver.

The smart watch system allows real-time collaboration with staff located remotely, enabling swift responses and visualization of progress. …

  • IoT Traceability system domain

PEGASUS Traceability System Overview Document Thai ver.

The system enables traceability by tracking and recording the processes from production to distribution and sales of products, contributing to quality management and enhancing rel…

  • IoT Traceability system domain

PEGASUS Energy Management System Overview Document Thai ver.

This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Detailed Document Thai ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…