Document list

Energy Management System Cover JP
  • IoT Traceability system domain

PEGASUS Energy Management System Detailed Document Japanese ver.

This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.Thi…

  • IoT Traceability system domain

PEGASUS Energy Management System Overview Document Japanese ver.

This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Detailed Document Japanese ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • IoT Traceability system domain

PEGASUS Visualization / IoT System Overview Document Japanese ver.

This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…

  • Production Management System Domain

Systems for the Manufacturing and Logistics IndustriesPEGASUS Comprehensive Catalog Detailed Documentation Japanese ver.

This is the comprehensive catalog of the PEGASUS series. It features solutions developed for customers in the manufacturing and logistics industries. Each package can be purchased…

TOMAS TECH 会社案内 表紙 JP Feb 2026
  • General

Company Profile Japanese ver.

Our company is a system development firm that provides services to the manufacturing and logistics industries. We propose solutions for "cost reduction" and "business efficiency."…