This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.Thi…
																			This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …
																			This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…
																			This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…
																			This is the comprehensive catalog of the PEGASUS series. It features solutions developed for customers in the manufacturing and logistics industries. Each package can be purchased…
																			Our company is a system development firm that provides services to the manufacturing and logistics industries. We propose solutions for "cost reduction" and "business efficiency."…