This system collects and analyzes energy data, including flow rates, electricity, and water consumption, in real-time to optimize energy use and support sustainable operations.Thi…
This system collects and analyzes energy data such as flow rates, electricity, and water consumption in real-time, optimizing energy use and supporting sustainable operations. …
This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…
This system connects equipment and machinery in the manufacturing environment to a network, visualizing data such as operating status, temperature and humidity, and energy consump…