製造DXバナー
Digital Picking System - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援

Solution 15

Digital Picking System

The Digital Picking System is a solution designed to enhance efficiency in parts picking processes and inventory management. This system utilizes light pick terminals to assist in the selection of components for each product, enabling workers to perform picking tasks accurately. It features a “Poka-Yoke function” to prevent mis-selection and is designed for easy installation on any shelf, allowing for flexible relocation and changes in location. Additionally, it can be integrated with logistics equipment such as conveyors, making it adaptable for a wide range of applications.

Benefits

  1. Reduction of Picking Errors
    By visually indicating the location of components through the light pick terminal, the system prevents the selection of incorrect parts, significantly reducing picking errors.
  2. User-Friendly Operation
    With the system supporting component selection, even beginners or less experienced workers can easily perform picking tasks, enhancing consistency and accuracy in operations.
  3. Quality Improvement with Poka-Yoke Function
    Equipped with a “poka-yoke function” that prevents progress to the next step until the correct part is selected, the system helps avoid process errors and ensures high quality in work.
  4. Flexibility in Installation
    The simple equipment configuration requires no electrical work, allowing for easy installation on any shelf or workspace, and enabling quick adaptations to location changes.
  5. Integration with Logistics Equipment
    The system can connect with logistics-related equipment such as conveyors, allowing for flexible responses to complex logistics processes and small-lot, diverse production, thereby achieving efficient inventory management and picking.