製造DXバナー
Smart Watch System - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援

Solution 04

Smart Watch System

The Smart Watch System is a solution designed for rapid communication with staff located in different areas. By utilizing this system, various requests and notifications that arise on the worksite can be transmitted in real-time to specific individuals or groups through smartwatches. When equipment abnormalities or item transport requests occur, immediate notifications are sent, enhancing response speed and reducing response time. Additionally, by visualizing the on-site response status, it becomes possible to accurately grasp work progress, thereby supporting efficient business operations.

Benefits

  1. Rapid Coordination and Reduced Response Time
    When abnormalities or requests arise, notifications are immediately sent to the smartwatches, allowing personnel to respond swiftly. This significantly shortens the time to address issues, improving the speed of problem resolution on-site.
  2. Reduction of Response Time Loss
    By efficiently summoning staff located remotely through the use of smartwatches, unnecessary movement and waiting time can be minimized. This enhances work efficiency and alleviates the burden on staff.
  3. Visualization of Response Status
    The response status of each staff member is recorded and displayed in real-time through the smartwatches, allowing for accurate tracking of progress. On-site managers can easily check the status of tasks and whether they have been completed, facilitating overall management of operations.
  4. Group Notification Functionality
    Notifications can be sent not only to specific individuals but also to entire teams or groups. This allows for simultaneous information sharing with all relevant staff, enabling smooth communication.
  5. Enhanced Operational Efficiency and Safety
    Utilizing notifications via smartwatches on the worksite enables efficient progress of operations. Additionally, important alerts, such as equipment abnormalities, can be addressed immediately, contributing to improved safety.

Introduction Video