製造DXバナー
Implementing small steps to meticulously meet the demands of the production site. - TOMAS TECH CO.,LTD.|タイの製造業・物流業のDX化を支援

Case Study List

Kaneka (Thailand) Co.,Ltd

Implementing small steps to meticulously meet the demands of the production site.

Challenges Before Implementation

1. Human errors due to manual operations. During the process of transcribing paper production daily reports into Excel and reflecting them in the system, there were cases of information entry mistakes and loss of paper data.
2. Inability to timely grasp accurate inventory information. There was a time lag of 2 to 3 days between production and reflecting the information in the system.

Solution Provided

PEGASUS Inventory Management System, Manufacturing Process Management System

Results After Implementation

With timely access to inventory information, production efficiency has significantly improved. The entire process from material stock receipt to production and finished product shipment can be managed within a single system. Additionally, quality inspection information has been database-driven, enabling integration with the system and enhancing efficiency in various operational aspects. Moving forward, we aim to further improve management accuracy, eliminate excess inventory, and expedite defective product handling. — Mr. Hamamatsu, GM at Kaneka (Thailand)

Reasons to Choose Us

The ability to develop and customize the system according to our needs in small steps was the key deciding factor. TOMAS TECH is installed the system in two phases, ensuring smooth operation on-site. We have also benefited from detailed support after implementation. — Mr. Yokoyama, MD at Kaneka (Thailand)

Client Information
Kaneka Corporation is a leading comprehensive chemical manufacturer based in Kita-ku, Osaka, and Minato-ku, Tokyo. In 2015, it established Kaneka (Thailand) Co., Ltd. to manufacture and sell expanded resin products in Thailand and Southeast Asia. Recently, the company has expanded its product range to include food, solar cells, and wigs in Thailand and ASEAN countries.