Case Study List

UEDA PLASTIC (THAILAND) CO.,LTD.
1. Wanted to eliminate the manual data entry of handwritten daily reports.
2. Needed to manage production information in real-time.
PEGASUS Inventory Management System, Operation Management System, Smart Watching System
1. Achieved management of historical information from the inbound of materials to the shipment of finished products. In the event of issues, it became easy and quick to identify the lot.
2. Enabled real-time monitoring of the operating status of molding machines and the number of completed products. Additionally, by linking with smartwatches, staff can receive abnormal notifications even from remote locations, reducing response time.
“We wanted to focus on the necessary functions and eliminate unnecessary ones. TOMAS TECH’s flexibility in adding and modifying features to suit our operations was a decisive factor. I felt it was backward to change our on-site processes to use the system. TOMAS TECH designs the system to align with our manufacturing processes, making it user-friendly for our staff and minimizing operational burdens. Throughout the development, TOMAS TECH is always considered feedback from on-site staff to create an easy-to-use system.” — Mr. Iijima, UPT