Solution 57

RCS fleet control

The RCS (Robot Control System: RCS-2000) handles task allocation, scheduling and operational maintenance for all robots. Using various scheduling algorithms for optimal task assignment, multi-robot path planning and traffic management enable efficient, interference-free collaboration.

Key features

  • Multi-robot path planning and traffic management for collision avoidance
  • Task management across warehouses and production lines
  • Integration with iWMS and host systems (WMS/MES/ERP)
  • Grouping of multiple RCS for large-scale operation (thousands of robots per project)

Benefits

  • Large-scale scheduling for thousands of AMRs over million-m² fields
  • Visualization dashboards to analyze and optimize execution rate, anomalies and routes
  • Real-time monitoring via digital twin / process visualization
  • Flexible graphical configuration for complex business scenarios

System integration

Connects to ERP, WMS, MES and OMS via standard interfaces, unifying inbound/outbound, inventory and manufacturing data to centrally manage the robot fleet and optimize plant-wide logistics.