Solution 54

Forklift AMR

Forklift AGV/AMR (FMR: Forklift Mobile Robot) automatically lifts and transports pallets and heavy loads, removing the need for manual forklift operation and greatly improving safety and efficiency. Rated load 300kg–3000kg, lifting height up to 4.5m.

Product series

  • Omnidirectional: diagonal/lateral movement in narrow aisles, high storage density
  • Stacking: 1000–3000kg, up to 4.5m, CE certified
  • Transport: up to 2m/s, lightweight with high-capacity battery
  • Reach / Counterbalance: compatible with various pallets, most versatile line

Safety & performance

  • 360° environmental perception detects people and objects
  • Millimeter-level positioning with laser + camera vision
  • Contour navigation for easy deployment
  • Load displacement, storage occupancy and low/hanging object detection

Industries

Lithium battery, beverage, home appliance, automotive parts, 3C and tobacco — anywhere pallet transport and high-rack storage are needed. Integrates with conveyors, AS/RS and automatic doors.